1.葛洲坝水电站发电机组的总功率为271.5万千瓦,如果发电机组一年工作时间为250天,那么一年能发多少千瓦时的电?~

wanren82182022-10-04 11:39:541条回答

1.葛洲坝水电站发电机组的总功率为271.5万千瓦,如果发电机组一年工作时间为250天,那么一年能发多少千瓦时的电?~
2.一台电动机转子线圈的电阻是3欧,当接在220V的电源上工作时 电动机消耗44千瓦,求
1)电动机工作室的电流;
2)电动机工作5小时消耗多少千瓦时的电;
3)电流通过电动机转子线圈5小时产生的热量.

已提交,审核后显示!提交回复

共1条回复
筱佳的微笑 共回答了17个问题 | 采纳率94.1%
1 W=Pt=271.5*10^4KW*250*24h=1.629*10^10KWh
2 1)I=P/U=44KW/220V=200A(怀疑是功率给错了,怎么会这么大的电流)
2)W=Pt=44KW*5h=220KWh
3)Q=I^2Rt=(200)^2*3*5*3600=2.16*10^9J(用你的数据算出来的发热比总电功还要大)
你注意关系式的用法就好,数据我觉得有问题.
1年前

相关推荐

葛洲坝水电站发电机组的总功率为271.5万千瓦,一年能大多少电,如果一个60万的中等城市有15万用户,
dadubvlc1年前1
deadhellman 共回答了16个问题 | 采纳率100%
读不懂题,请说明白点!
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?拦河大坝为什么修得上窄下宽?
cnct3lb91年前1
ansenle 共回答了25个问题 | 采纳率100%
解题思路:①已知水的密度和深度,利用公式P=ρgh可以得到潜水员受到的压强;
②液体压强与液体的密度和深度都有关系,在密度一定时,液体深度越大,产生的压强越大.

水对潜水员的压强为P=ρgh=1.0×103kg/m3×9.8N/kg×40m=3.92×105Pa;在密度一定时,由公式P=ρgh知,液体的压强随深度的增加而增大,也就是拦河大坝底部受到水的压强更大,为了堤坝的牢固,所以修成上窄下宽的形状...

点评:
本题考点: 液体的压强的计算;液体的压强的特点.

考点点评: 此题考查液体压强公式的应用和液体压强的规律,属于基础题,直接利用公式分析即可.

有人说大笛克桑斯大坝比葛洲坝水电站重力势能大能够得出这样的结论吗?为什么?
水清亭1年前1
张涛 共回答了16个问题 | 采纳率93.8%
重力势能取决电站的落差,落差越大,势能就越大,两个电站落差比较就知道那个大了
英语翻译三峡水利枢纽大坝位于宜昌市的长江干流上,并和其下游不远的葛洲坝水电站形成梯级调度电站.它是世界上规模最大的水电站
英语翻译
三峡水利枢纽
大坝位于宜昌市的长江干流上,并和其下游不远的葛洲坝水电站形成梯级调度电站.它是世界上规模最大的水电站,也是***有史以来建设的最大型的工程项目.
坝高185米,总库容393亿立方米,其中防洪库容221.5亿立方米.
三峡水利枢纽有着“对上可以调蓄、对下可以补偿”的独特作用,三峡工程的防洪、发电、通航、补水等综合效益开始全面发挥.
三峡大坝建成后,将形成巨大的水库,滞蓄洪水,使下游荆江大堤的防洪能力,由防御十年一遇的洪水,提高到抵御百年一遇的大洪水,防洪库容在73—220亿立方米之间.世界防洪效益最为显著的水利工程.如遇1998年洪水,可有效防御.
小浪底水利枢纽
小浪底是三门峡以下唯一能够取得较大库容的坝址.小浪底水库因此成为防御黄河下游特大洪水的重要工程.有效地控制黄河洪水,可使黄河下游花园口的防洪标准由六十年一遇提高到千年一遇.黄河小浪底水利枢纽工程是黄河干流上的一座集减淤、防洪、防凌、供水灌溉、发电等为一体的大型综合性水利工程.
目前我们***七大江河,从流域来讲,都能防御***以来最大的洪水.特别是在1998年长江大水以后,***加大了水利建设的投入.据统计,1998年到现在,***投入2858亿元,用于防洪工程建设的投资是1734亿元.
据统计,截至目前,***已建成各类水库8.6万多座,堤防长度28.69万公里,***大江大河主要河段已基本具备了防御新***成立以来发生的最大洪水的能力,中小河流具备防御一般洪水的能力,保护人口5.7亿,保护耕地4.6万千公顷.***639座有防洪任务的大、中、小型城市,有299座通过防洪工程建设达到设防标准.水利工程设施体系不断加强,大江大河大湖防洪状况极大改善,水利对人***命财产安全的保障作用和对经济社会发展的支撑能力进一步增强.
zxcvoiusdiaufoas1年前2
西域苍鹰 共回答了20个问题 | 采纳率100%
Three gorges water conservancy hub
The dam is located in the Yangtze river mainstream,yichang and their downstream and not far from the gezhouba hydropower station of cascade hydropower station form scheduling.It is the world's largest hydropower station,the construction of Chinese history is the most large engineering projects.
Dam,185 meters high,the total capacity of 39.3 billion cubic meters,including flood control capacity of 22.15 billion cubic meters.
The three gorges water control project has a "for the storage,can compensate for" the unique function of the three gorges project,the flood control,power generation,navigation,moisturizing and comprehensive benefit overall play began.
After the completion of the three gorges dam,will form the enormous reservoir,sluggish water,and downstream lower jingjiang river flood of flood control ability,the dam defense ten years of the worst flooding,rising to resist the worst flooding in years the flood,the capacity of the flood control in 73-22 billion cubic meters between.The most significant benefits of flood control the water conservancy project.In case of the flood,which can effectively defense.
Xiaolangdi project
There is the only can make great sanmenxia reservoir dam site.Xiaolangdi reservoir therefore become a defense of the lower Yellow River catastrophic floods of important engineering.Effective control of the Yellow River floods,can make the lower Yellow River,the flood control standard HuaYuanKou by 60 years once QianNianYiYu to improve.The Yellow River xiaolangdi project on the Yellow River basin is a collection of sedimentation reduction,flood control,water supply,irrigation,power generation FangLing,is a large comprehensive water conservancy project.
At present our country seven big rivers,from the valley speaking,can the biggest since the establishment of the defense.Especially in 1998 after the floods the Yangtze river,the central increased investment in water conservancy construction.According to statistics,1998 to now,the investment is 285.8 billion yuan,used for flood control of the engineering construction investment is 173.4 billion yuan.
According to statistics,by now the country has built more than 86000 seats,all kinds of reservoir dyke 286900 kilometers long,the large rivers in our country has basically met the main reach the defense since the founding of the worst flooding ability,medium and small rivers have defense of the flood protection ability,general population of 570 million,protect arable land 46000 hectares.The national 639 seats have the task of flood control large,medium and small cities,there are 299 buildings through the flood control engineering construction to fortify standards.Water conservancy project continuously strengthen infrastructure system,big rivers and lakes,the water conservancy and flood control status great improvement of people's life and property security role in economic and social development and further enhance the support ability.
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?拦河大坝为什么修得上窄下宽?
luofei3211年前1
dingyang12 共回答了13个问题 | 采纳率92.3%
解题思路:①已知水的密度和深度,利用公式P=ρgh可以得到潜水员受到的压强;
②液体压强与液体的密度和深度都有关系,在密度一定时,液体深度越大,产生的压强越大.

水对潜水员的压强为P=ρgh=1.0×103kg/m3×9.8N/kg×40m=3.92×105Pa;
在密度一定时,由公式P=ρgh知,液体的压强随深度的增加而增大,也就是拦河大坝底部受到水的压强更大,为了堤坝的牢固,所以修成上窄下宽的形状.
答:水对潜水员的压强为3.92×105Pa;液体压强随深度的增加而增大.

点评:
本题考点: 液体的压强的计算;液体的压强的特点.

考点点评: 此题考查液体压强公式的应用和液体压强的规律,属于基础题,直接利用公式分析即可.

(2002•长沙)韶山4型电力机车在牵引列车运行时,是将电能转化为______能.葛洲坝水电站的发电机组在运行时,是将_
(2002•长沙)韶山4型电力机车在牵引列车运行时,是将电能转化为______能.葛洲坝水电站的发电机组在运行时,是将______能转化为______能.
520ARI1年前1
深圳绵羊 共回答了23个问题 | 采纳率82.6%
解题思路:拦河坝内很高的水位使水具有了很大的重力势能,在向下流动时又转化为动能,推动发电机的叶轮转动,最终发出电来.家用电风扇则是消耗电能,使风扇进行转动.

韶山4型电力机车在牵引列车运行时,是将电能转化为机械能;水在推动发电机叶轮转动时,主要是机械能转化为电能.
故答案为:机械;机械;电.

点评:
本题考点: 能量的转化和转移.

考点点评: 水能中的动能与重力势能都属于机械能,发电机是将机械能转化为电能的,它与电动机的能量转化正好相反.

葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?拦河大坝为什么修得上窄下宽?
陈浩然19951年前2
天空彩云密布 共回答了17个问题 | 采纳率88.2%
解题思路:①已知水的密度和深度,利用公式P=ρgh可以得到潜水员受到的压强;
②液体压强与液体的密度和深度都有关系,在密度一定时,液体深度越大,产生的压强越大.

水对潜水员的压强为P=ρgh=1.0×103kg/m3×9.8N/kg×40m=3.92×105Pa;
在密度一定时,由公式P=ρgh知,液体的压强随深度的增加而增大,也就是拦河大坝底部受到水的压强更大,为了堤坝的牢固,所以修成上窄下宽的形状.
答:水对潜水员的压强为3.92×105Pa;液体压强随深度的增加而增大.

点评:
本题考点: 液体的压强的计算;液体的压强的特点.

考点点评: 此题考查液体压强公式的应用和液体压强的规律,属于基础题,直接利用公式分析即可.

三峡和葛洲坝水电站那个离宜昌近?
三峡和葛洲坝水电站那个离宜昌近?
帮下忙 也就是说在地图上 那个 更靠 西边
水雾云烟1年前1
liudegang 共回答了22个问题 | 采纳率86.4%

“思嘉斯佳丽”说得没错,事实上,葛洲坝城区也是宜昌市区的一个部分,还不算郊区,从原火车站坐公交到葛洲坝大坝上也就十几分钟.现在宜昌建了新的火车站,不在市中心,所以要远一点.我家就在葛洲坝旁边,出门就能看见.我也去过三峡,走高速公路大概要40分钟,其实离市区也很近了.但相对说来,葛洲坝就在市区,随便站在一座高一点的楼上就能看见,但三峡是看不见的.

龙羊峡水电站、刘家峡水电站、小浪底水电站、二滩水电站、葛洲坝水电站分别位于那一条河流上?
龙羊峡水电站、刘家峡水电站、小浪底水电站、二滩水电站、葛洲坝水电站分别位于那一条河流上?
O(∩_∩)O谢谢啦!帮帮忙!
id_richie1年前1
陨落之风 共回答了21个问题 | 采纳率90.5%
前三是黄河干流,最后的是长江干流上.二滩是在四川省西南部的雅砻江下游(长江支流).
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?
葛洲坝水电站拦河大坝,上游水深50m.潜水员潜入水中检查坝底情况.当潜水员潜入水下40m深处时,水对潜水员的压强是多大?拦河大坝为什么修得上窄下宽?
阳光眯着眼看我们1年前1
dhl278 共回答了18个问题 | 采纳率100%
解题思路:①已知水的密度和深度,利用公式P=ρgh可以得到潜水员受到的压强;
②液体压强与液体的密度和深度都有关系,在密度一定时,液体深度越大,产生的压强越大.

水对潜水员的压强为P=ρgh=1.0×103kg/m3×9.8N/kg×40m=3.92×105Pa;
在密度一定时,由公式P=ρgh知,液体的压强随深度的增加而增大,也就是拦河大坝底部受到水的压强更大,为了堤坝的牢固,所以修成上窄下宽的形状.
答:水对潜水员的压强为3.92×105Pa;液体压强随深度的增加而增大.

点评:
本题考点: 液体的压强的计算;液体的压强的特点.

考点点评: 此题考查液体压强公式的应用和液体压强的规律,属于基础题,直接利用公式分析即可.

如果把地球上的潮汐能都利用起来,每年可发电12400亿度,相当于110座葛洲坝水电站的发电量.
如果把地球上的潮汐能都利用起来,每年可发电12400亿度,相当于110座葛洲坝水电站的发电量.
这里的如果为什么不能删除?
zhaokuit11年前3
心盖天下 共回答了20个问题 | 采纳率90%
首先因为它是个假设.“如果”这里表示假设的意思.出于文法的需要,如果删除了,那么就成为描述了.
其次,并不存在不能删除“如果”.删除了之后,整个句子依然存在假设的语气,只是不直白而已.