工艺方案示意图说明

Sketch map of process specifications

一、 大梁货架方案说明

图示为货架方案构想图草案,初步设计尺寸为21600*8200*2400,悬臂长1400mm。此货架悬臂较长,货物堆码高,存放物较重(50.4T),确保存取安全和作业方便为货架设计之首要条件,我们咨询了国内数家专业知名的物流设备供应商,目前还未找到较完善的方案,草图方案仅适合存放直通梁,但折弯梁的存取便利及安全性还需另行研讨,设计。

甲方需对存放架地坪作特别处理,货架配备专用堆垛行车由甲方负责(行程高度确保,带叉臂,不需另作吊具),为确保存取安全每层堆垛建议作安全带捆扎处理(冲压完成后)。存放区作特别安全警戒线,严禁非作业者进入。

1.side member storage shelf

the map show that draft of storage shleve, preliminary design dimensions: 21600*8200*2400, length cantilever beam 1400mm. This cantilever beam longer,pile higher,deposit heavier(50.4T),the design of storage shelve must be sure that it is safe for access security and convenient operation.we asked some logistics equipment suppliers,but haven"t a better programme.Draft options only for direct type beam, we need to studying and designing about

the stacking crane to shore and get out the materials of bended side member.

first party need to do some special treatment for storage shleve floor, By first party responsible for stowing travelling crane(ensure highly trip,fork arm,no hanger). Storage areas for special security cordon,no enter without permission.

二、 转运平板车方案

规划数量计24台,12套,平板车初步尺寸为2800*400*400,车轮选用特殊类别,中间为铸铁外包优力胶,每个车轮设计承重2T。按生产纲领计算生产使用中8套,搬运作业中1套,预存放3套,共计12套。每台车配备牵引挂钩。甲方配备牵引车头及与平板车相连的牵引连拉杆。

2.Transferring trailing bar trolley

Planning number 24,12sets, dimensions: 2800*400*400,the wheel used Special categories, Bearing 2T per wheel.on production Programme that used 8sets in process,1 set in handling operations,3 sets deposit,amount 12 sets. Each vehicle equipped with traction link.

三、 大梁从零工位上一工位方案

大梁由牵引车头拖至零工位后,车头返回,平板车停在零工位,由于质量重需由动力牵引至一号工位,规划方案为采用电动马达带绞盘机构,配置钢绳(前端有挂钩)挂在平板车上开动马达拖至一工位,行程距离约为15m,运行时蜂鸣警示器启动。地表设限位块,马达、绞盘需地沟预埋工程。

3.project from workstation 0 to workstation 1

After side member to workstation 0 by towing power,front back,stop in workstation 0, As required by the heavy traction power to workstation 1, the plan for the introduction of electric motors with winch, configuration Steel (linked to a front-end) pegged to the starting motor in the flatbed truck towed to a public place. Trip distance of about 15 m.

四、 第一工位平面图说明

纵梁上夹具左右共配置两套吊挂系统,纵轨、横轨采用国内浙南品牌,起吊葫芦采用DEMAG,悬挂风动工具、电钻用KBK轨道,浙南平衡器。由一工位至二工位配置2T葫芦(国内品牌),配置专用搬送吊具(乙方制作)。夹具为可调节式,对应不同车种夹持定位作业,夹具可翻转90°

4.Ichnography workstation 1

Hanging system have collocated by L/R jig on side member, Lifting hoist used DEMAG, Hoisted pneumatic tools. Configuration 2T hyacinth (domestic brands)by workstation 1 to workstation 2, Dedicated to feed the spreader configuration (B production),jig adjustable, overturned.

五、 车架第二工位平面示意图说明

车架总拚夹具满足不同宽度和不同腹高的车架装配,不同轴距支承可调,在后轴车种切换采用滑动手动定位,中间梁装配配置中间梁台车共9台。工具吊挂轨道采用KBK,大梁总成搬送配一套2T葫芦(国产),和乙方自制专用吊具,轨道采用浙南牌。在平衡轴、中间梁存放区配置工字钢构(国产或浙南),葫芦选用DEMAG。

5.Frame ichnography workstation 2

Fixture satisfy the needs of different widths and different abdominal high frame assembly, supporting different adjustable wheelbase,manually positioning by rear axle vehicles switch.9 sets middle member. KBK orbit using tools hanging.

meira

Craft plan schematic drawing explanation

First, summer beam shelf program narrative

The graphical representation for the shelf plan conception chart draft, the preliminary design size is 21600*8200*2400, hangs reach 1400mm. This shelf bracket is long, the cargo piles the code to be high, depositing heavy (50.4T), guaranteed that deposit security and work convenience for shelf design first condition, we have consulted the domestic several specialized well-known physical distribution equipment supplier, at present had not found the perfect plan, the schematic diagram plan only suits depositing to go nonstop to Liang, but folds the camber beam the deposit convenience and the security also needs the separate deliberation, design.

The first party must to deposit grounds around a house to do processes specially, the shelf provides special-purpose piles up the driving to be responsible for (traveling schedule by the first party guarantee highly, brings fork arm, cannot make hoisting mechanisms in addition), to guarantee that the deposit safe each level piles up suggested after making the safety belt to tie up processing (ramming to complete). The depositing area makes the special security warning line, refuses the non-work to enter

Second, transportation flatbed plan

Plan number gauge 24, 12 sets, the flatbed preliminary size is 2800*400*400, the wheel selects the special category, middle for cast iron outsourcing superior strength rubber, each wheel design load-bearing 2T. According to the production guiding principle computation production use in 8 sets, transport in the work 1 set, deposits 3 set in advance, total 12 sets. Each trolley equipment tows the suspension hook. The first party equipment tows the front and with the flatbed connected hauling continually tension bar.

Third, summer beam from zero location a location plan

The summer beam by tows the front tows after zero location, the front returns, the flatbed stops in zero location, because the quality heavy must by the power traction to the first location, the plan plan to use the electrically operated motor belt capstan organization, the disposition steel cable (front end has suspension hook) to hang when the flatbed starts the motor to tow to a location, the traveling schedule is away from approximately is 15m, the movement the buzzing caution start. The surface supposes the spacing block, the motor, the capstan needs the trench to bury the project in advance.

Fourth, the first location horizontal plan shows

On the carline about the jig altogether disposes two sets to hang the system, the vertical axle, the cross rail use the domestic South Chekiang brand, the hoisting up bottle gourd use DEMAG, the hand pneumatic tool, the electric drill use the KBK track, the South Chekiang balancer.Disposes the 2T bottle gourd by a location to two locations (domestic brand), the disposition special-purpose moves delivers the hoisting mechanisms (second party to manufacture).The jig for may adjust the type, corresponds does not take the same bus to plant the clamp localization work, the jig may turn over 90°

Fifth, frame second location plane schematic drawing explanation

The frame always struggles the jig to satisfy the different width and the different abdomen high frame assembly, different spread of axies supporting adjustable, plants the cut in the hind axle vehicle to use the glide manual localization, intermediate girder assembly disposition intermediate girder trolley altogether 9. The tool hangs the track to use KBK, the summer beam unit moves delivers matches a set of 2T bottle gourd (domestic product), with the second party self-restraint special-purpose hoisting mechanisms, the track uses the South Chekiang sign. In the staff, the intermediate girder depositing area disposition I-steel construction (domestic product or South Chekiang), the bottle gourd selects DEMAG.

皮皮

这个肯定对的,机器翻译,

First, the girder shelf programme

Icon shelf options and ideas for the draft plans, preliminary design size of 21600 * 8200 * 2400, 1400 mm long cantilever. This cantilever shelves longer, cargo stacking, storage of heavier (50.4 T), to ensure access to safe and convenient operation for the primary design of the shelves, we have consulted with a number of professional well-known domestic logistics equipment suppliers, has yet to find a better programme, the draft programme for storage only through beam, but bending beam convenience and safety of access needed further study and design.

Party A to the need for storage-Ping for special treatment, special stacking shelves with the owner responsible for the traffic (to ensure a high degree of itinerary, with wishbone without a separate spreader), in order to ensure access to safe stacking library proposal Banding seat belts for processing (after the completion of stamping). Storage areas for special security cordon, is prohibited from entering non-operational.

Second, transit flatbed truck programme

Planning volume in the 24, 12 sets, flatbed truck initial size of 2800 * 400 * 400 and the wheels of a special category selection, with a gifted cast iron outsourcing of plastic, each wheel bearing design T 2. Production Programme calculated by the use of the eight sets of production, handling operations in one set, three sets of pre-stored a total of 12 sets. Each vehicle equipped with traction link. Party A tractor equipped with the first flatbed truck and connected with the traction even drawbars.

Third, from the chore of girders on a programme of work

Beam from the first tractor-towed chore, to return to the front, flatbed truck parked in the chore of, as required by the re-quality dynamic traction to the place on the 1st, the plan for the introduction of electric motors with winch, configuration Steel (linked to a front-end) pegged in the flatbed truck on the running of the motor towed to a journey distance of about 15 m, running Fengming warning device is switched. Limit surface located blocks, motors, winch to Trench embedded projects.

4, the first-floor plan that

Beam fixture on the total allocation of about two sets of hanging systems, vertical track, cross country track used brand of southern Zhejiang, lifting hoist used DEMAG, hanging风动工具, electric drills with KBK track, southern Zhejiang Balancer. From the one-to two-position Configuration 2 T hyacinth (domestic brands), dedicated to feed the spreader configuration (B production). Fixture for an adjustable, clamping with different kinds of vehicles operating position, can be overturned 90 ° Fixture

5, the second frame diagram of the plane

Frame the fight fixture satisfy the needs of different widths and different abdominal high frame assembly, supporting different adjustable wheelbase, rear axle vehicles in the use of a sliding switch manually positioning, beam assembly middle-beam configuration among a total of nine vehicles. KBK orbit by hanging tools, girder assembly moved Songpei a 2 T hyacinth (domestic), and B for self-Sling, a track south of Zhejiang licensing. Benghengzhou in the middle beam storage area configuration I-beam structure (domestic or southern Zhejiang), gourd selection DEMAG.

max笔记

The craft plan schematic drawing showed that one, summer beam shelf program narrative the graphical representation for the shelf plan conception chart draft, the preliminary design size is 21600*8200*2400, hangs reach 1400mm. This shelf bracket is long, the cargo piles the code to be high, depositing heavy (50.4T), guaranteed that deposit security and work convenience for shelf design first condition, we have consulted the domestic several specialized well-known physical distribution equipment supplier, at present had not found the perfect plan, the schematic diagram plan only suits depositing to go nonstop to Liang, but folds the camber beam the deposit convenience and the security also needs the separate deliberation, design. the first party must to deposit grounds around a house to do processes specially, the shelf provides special-purpose piles up the driving to be responsible for (traveling schedule by the first party guarantee highly, brings fork arm, cannot make hoisting mechanisms in addition), to guarantee that the deposit safe each level piles up suggested after making the safety belt to tie up processing (ramming to complete). The depositing area makes the special security warning line, refuses the non-work to enter. two, transportation flatbed plan plan number gauge 24, 12 sets, the flatbed preliminary size is 2800*400*400, the wheel selects the special category, middle for cast iron outsourcing superior strength rubber, each wheel design load-bearing 2T. According to the production guiding principle computation production use in 8 sets, transport in the work 1 set, deposits 3 set in advance, total 12 sets. Each trolley equipment tows the suspension hook. The first party equipment tows the front and with the flatbed connected hauling continually tension bar. the three, summer beams from zero location location plan the summer beam by tows the front tows after zero location, the front returns, the flatbed stops in zero location, because the quality heavy must by the power traction to the first location, the plan plan to use the electrically operated motor belt capstan organization, the disposition steel cable (front end has suspension hook) to hang when the flatbed starts the motor to tow to a location, the traveling schedule is away from approximately is 15m, the movement the buzzing caution start. The surface supposes the spacing block, the motor, the capstan needs the trench to bury the project in advance. the four, first location horizontal plans showed that on the carline about the jig altogether disposes two sets to hang the system, the vertical axle, the cross rail use the domestic South Chekiang brand, the hoisting up bottle gourd use DEMAG, is hanging the pneumatic tool, the electric drill to use the KBK track, the South Chekiang balancer. Disposes the 2T bottle gourd by location to two locations (domestic brand), the disposition special-purpose moves delivers the hoisting mechanisms (the second party manufacture). The jig for may the adjustment type, correspond does not take the same bus to plant the clamp localization work, the jig may turn over 90° the five, frame second location plane schematic drawing to explain that the frame always struggles the jig to satisfy the different width and the different abdomen high frame assembly, different spread of axies supporting adjustable, plants the cut in the hind axle vehicle to use the glide manual localization, intermediate girder assembly disposition intermediate girder trolley altogether 9. The tool hangs the track to use KBK, the summer beam unit moves delivers matches a set of 2T bottle gourd (domestic product), with the second party self-restraint special-purpose hoisting mechanisms, the track uses the South Chekiang sign. In the staff, the intermediate girder depositing area disposition I-steel construction (domestic product or South Chekiang), the bottle gourd selects DEMAG.

黑桃云

The sketch map elucidation of the craft project

A, the project elucidation of the crossbeam shelf

The diagram shows for the shelf project speculation diagram drafted plan, the first step designs the size as 21600*8200*2400, hang arm to grow a 1400 mms.This shelf hangs arm longer, goods heap the code is high, depositing a thing more heavy(50.4 Ts), insure the access safety and homework convenience as the initial condition of[with] shelf design, we consulted with a local several professional well-known logistics equipments supplier, haven"t found out a more perfect project so far, grass diagram project only in keeping with deposit to keep a beam, but fold curved access convenience and safety of beam still need an another line to study and discuss, design.

The first party needs to make a special processing towards depositing a ground ping, shelf equipment appropriation heap the go the first party is responsible for car, for insure to access a safe and each heap suggestion to make safety belt to tie~up a firm processing.(blunt press completion behind)Depositing the area makes specially safe and warnning line, strictly forbiding non- homework into.

Two, the transport flat panel car project

The programming amount accounts 24 sets, 12 set, the flat panel car initial size is 2800*400*400, the car wheel chooses to use a special category, wrapping excellent dint gum outside for the iron casting in the center, each car wheel design accepts a heavy 2 Ts.The outline calculation of pressing the production produces usage win 8 set, transport 1 set in the homework, prepare to deposit 3 sets, add up to 12 sets.The trolley equipment leads a hook each time.The first party provides with to lead a car head and connects with each other with flat panel car of lead to connect to pull a pole.

Three, the crossbeam is from the odd jabs a last project

Crossbeam from after leading a car head to drag along to the odd jabs, the car head returns, the flat panel car parks an odd jabs, because of quality heavy need is led by the motive to the No.1 work, program in order to adopt electric motor to take capstan organization, the project installs a steel rope(the head have a hook) to hang on the flat panel car to start motor to drag along to 1, the route of travel distance invites for the 15 ms, circulate hour the caution machine start.The earth"s surface establishes a limit piece, the motor, capstan needs a ground of ditch to prepare to cover up engineering.

Four, the first work plane chart elucidation

The tongs is or so to install 2 sets to mourn to hang system totally on the beam, the track, horizontal track adopts local south brand, rising to mourn bottle gourd adoption DEMAG, hanging breeze to begin to work a , electric drill to use KBK orbit, the south equilibrium machine.It is gone to 2 by 1 to install 2 T bottle gourd(local brand), install appropriation to move to send to mourn.(the second party create)The tongs is an adjustable stanza type, to clip in response to the different type of car hold fixed position homework, tongs inside out 90 °s

Five, car the second work the flat surface sketch map explain

The car always works hard for tongs to satisfy different width and different stomach a high car assemble, the different stalk is apart from to accept adjustable, at after the stalk type of car cut over adoption glide to move a fixed position, in the center the beam assemble install in the center the beam trolley is total 9 setses.The tool mourns to hang orbit adoption KBK, the crossbeam always becomes to move to send to go together with a set of 2 T bottle gourd(domestic), self-making appropriation to mourn with the second party, orbit adoption the south card.In the equilibrium stalk and in the center the beam deposit area to install the work word steel (national product or south), the bottle gourd chooses to use DEMAG.

ardim

翻译这么长200分?估计你给1000会有人给你一个字一个字的翻

贝贝

Schematic diagram of the process plans

First, the girder shelf programme

Icon shelf options and ideas for the draft plans, preliminary design size of 21600 * 8200 * 2400, 1400 mm long cantilever. This cantilever shelves longer, cargo stacking, storage of heavier (50.4 T), to ensure access to safe and convenient operation for the primary design of the shelves, we have consulted with a number of professional well-known domestic logistics equipment suppliers, has yet to find a better programme, the draft programme for storage only through beam, but bending beam convenience and safety of access needed further study and design.

Party A to the need for storage-Ping for special treatment, special stacking shelves with the owner responsible for the traffic (to ensure a high degree of itinerary, with wishbone without a separate spreader), in order to ensure access to safe stacking library proposal Banding seat belts for processing (after the completion of stamping). Storage areas for special security cordon, is prohibited from entering non-operational.

Second, transit flatbed truck programme

Planning volume in the 24, 12 sets, flatbed truck initial size of 2800 * 400 * 400 and the wheels of a special category selection, with a gifted cast iron outsourcing of plastic, each wheel bearing design T 2. Production Programme calculated by the use of the eight sets of production, handling operations in one set, three sets of pre-stored a total of 12 sets. Each vehicle equipped with traction link. Party A tractor equipped with the first flatbed truck and connected with the traction even drawbars.

Third, from the chore of girders on a programme of work

Beam from the first tractor-towed chore, to return to the front, flatbed truck parked in the chore of, as required by the re-quality dynamic traction to the place on the 1st, the plan for the introduction of electric motors with winch, configuration Steel (linked to a front-end) pegged in the flatbed truck on the running of the motor towed to a journey distance of about 15 m, running Fengming warning device is switched. Limit surface located blocks, motors, winch to Trench embedded projects.

4, the first-floor plan that

Beam fixture on the total allocation of about two sets of hanging systems, vertical track, cross country track used brand of southern Zhejiang, lifting hoist used DEMAG, hanging风动工具, electric drills with KBK track, southern Zhejiang Balancer. From the one-to two-position Configuration 2 T hyacinth (domestic brands), dedicated to feed the spreader configuration (B production). Fixture for an adjustable, clamping with different kinds of vehicles operating position, can be overturned 90 ° Fixture

5, the second frame diagram of the plane

Frame the fight fixture satisfy the needs of different widths and different abdominal high frame assembly, supporting different adjustable wheelbase, rear axle vehicles in the use of a sliding switch manually positioning, beam assembly middle-beam configuration among a total of nine vehicles. KBK orbit by hanging tools, girder assembly moved Songpei a 2 T hyacinth (domestic), and B for self-Sling, a track south of Zhejiang licensing. Benghengzhou in the middle beam storage area configuration I-beam structure (domestic or southern Zhejiang), gourd selection DEMAG.

相关推荐

adjustable是什么意思?

可调节的
2023-01-03 23:37:193

adjustable是什么意思

可调整的;可调节的
2023-01-03 23:37:304

adjustable 动词

adjustoperationsprinklingthrowninclutiondevelopment
2023-01-03 23:37:431

急求:adjusted和adjustable作形容词时有什么区别?

adjustable [ə"dʒʌstəb!] [词典释义]a. 1. 可调整的,可调节的 [网络释义]adjustable 1.可调整箭台 2.可调节的 3.可调校 4.可蝶的 Adjustable 1.可调节的 adjusted [ə"dʒʌstɪd] [词典释义]a. 1. 已适应的 [网络释义]adjusted 1.调整过的 2.校正的 Adjusted 1.调整后的
2023-01-03 23:37:491

英语四六级查询网址是什么?

通过以下官方网站均能查询到自己的四六级准考证号查询成绩:中国教育考试网,中国高等教育学生信息网,99宿舍网。同时四川教育发布的官方微博和微信号上查询自己的成绩。英语四六级要求掌握单词adjustable,词性为形容词,意思是可调整的,可校准的。1、Some people have a fifteen- or twenty-year loan, often with an adjustable interest rate instead of a rate that never changes.2、Low-income people were being given adjustable rate mortgages with very low starter rates, called "teaser rates," " that would be raised in the future.低收入人群贷款时会享受到刚开始利率巨低的可调利率,但是随着时间的推移利率会慢慢增长“,这就是所谓的“引逗利率。3、Adjustable rate mortgages have a long term -they might last for thirty years -but the interest rate is not fixed for the whole thirty years.可调利率抵押贷款的期限很长,也许会长达30年,但是利率在30年间并不是固定的。
2023-01-03 23:37:541

可调节的英语怎么说

adjustableadjust--调节。词性变换么就加加后缀咯
2023-01-03 23:38:041

可调节范围英文怎么写

可调节范围adjustable extent
2023-01-03 23:38:102

adjustable wrench是什么意思

是:可调扳手
2023-01-03 23:38:212

高分,“水温调节”怎么翻译成英文

water temperrature adjustment 我试着翻译的 不知道对不对
2023-01-03 23:38:299

问:什么是变化利率贷款(Adjustable ? Rate Loan)?

能具体点吗?你是指银行贷款?如果是银行贷款的话,意思就是,随着央行的调息,利率会有所变化
2023-01-03 23:38:571

什么是可调利率抵押贷款(Adjustable -rate Mortgages) 谁能帮忙详细解释一下

http://www.cmo.com.cn/0704z/tszs/zy.htm这个网址给你 ,看看行不
2023-01-03 23:39:033

转速表、仪表盘、转向盘、可调节座椅、轮胎、尾灯各英文是什么

转速表,tachograph仪表盘,dashboard;转向盘,drivingwheel可调节座椅,Adjustableseat轮胎,tyre尾灯taillight
2023-01-03 23:39:131

有哪位专业人士帮我翻译一下(中译英)急!!!

你用GOOGLE翻译吧
2023-01-03 23:39:498

英语翻译!我做家具橱柜行业,哪位高人帮我翻译一下!不要直译。最好是专业点的~非常感谢!我就这些分都给

1。抽屉柜 抽屉柜、四个抽屉5 / 8 "及18 " x 34½等×24寸,白色三聚氰胺。 2。基本单位的先发投手 先发投手的基本单位,60 " x 34½等×24寸,白色三聚氰胺,4扇门和2个抽屉5 / 8”,可调架左侧和右侧的柜子里。 3。存储单元 存储单元,24 " x 84×24寸,白色三聚氰胺等”,五5 / 6门可调的架子上 4。较低的转角柜 较低的转角柜,36 " x 34½×24,2架、1折叠门等,白色三聚氰胺。 5。上内阁12 " 12 " x上内阁12 x "等标志、一门”,2可调货架、白色三聚氰胺 6。填料带 填料条,白色三聚氰胺,3 " x 31” 7。脚趾踢 脚趾踢,白色三聚氰胺,4 " x"96”
2023-01-03 23:40:161

纺织英语,挺专业的英语

o.o
2023-01-03 23:40:229

Minecraft的光影效果里面的动态模糊怎么关掉啊!求救!快晃死我了。。。

按在进入游戏之后按ESC就可以打开选项在你的左下方有光影设置可以调整然后选择第一项就可以关掉了,望采纳哦~~~
2023-01-03 23:40:514

adjustment的形容词

automatic adjustment 可调整的:adjustable
2023-01-03 23:41:101

特急翻译,高分

01 Adjust 4 screws( high/ low); 02 Adjust 4 spring coils( high/ low); 03 Adjust 4 spring coils( up/ bottom); 04 1 spring coil washer; 05 Adjust 1 screw; 06 Tense 14* of 1.7* of spring coil 47 long,2; 07 Washer 5-10,1 set; 08 The machine pays 4 feet; 09 Empty windpipe 1 set; 10 Tool box; Live the wrench 1 pair of; 2 screw knife; Inside 3 hexangular wrenches; 2 sharp mouth pliers; Open the wrench 5.5-7 of,1; 8-10;10-12 of,2; 12-14;14-17 of,1; 17-19,13-13 of,1 set; 11 4 Mm, a hexangular wrench,1 set; 12 Plank,5 piece; 13 Lead the bridge plank,1 piece; 14 The machine claw 5 pair of; 15 Fuse,,2; 16 Screw,1 set; 17 The quantity protects the positive manual,1 set; 18 User manual,1.
2023-01-03 23:41:154

“头绳”用英语怎么翻译?

头绳英语翻译为:headband。headband英 [ˈhedbænd]   美 [ˈhɛdˌbænd]  n.(扎在额头上的)束发带,扎头带,头绳。1、A chaplet or headband decorated with gold or jewels.有金子或宝石的头绳或带状头饰。2、We matched his blood on the gearshift and on the headband I found in the alley.我们把他的血和头绳上的血迹以及我在栅栏上找到的拿去匹配了。3、Where did you find my ski headband?你在哪里找到我的滑雪束头绳带?4、Headband with Jet Metallic Silver Crystal Mesh on Alcantara; rhodium-plated details; adjustable elastic band.头绳与金属喷银水晶网对阿尔坎塔拉;铑镀细节;可调橡皮筋。5、For starters, there"s not a headband or haughty set of pearls in sight.首先,我们并没有看到惊艳的头绳或者是一套傲人的珠宝首饰。
2023-01-03 23:41:286

送料轮上下调节手柄 英语翻译, 我翻译送料轮是 feeding wheel. 请大家指教,简洁点的

我个人认为,wheel一般是轮子,送料轮会不会类似于下面有轮子的上面有平面的带子,如果这样的话,译为feeding band更好调节 regulating手柄 hand lever / handle上下不用翻译出来,含在regulating里了所以送料轮上下调节手柄可以译为:a regulating hand lever of the feeding band(或你译的wheel) 哦,那上下就是:up and downan up-and-down regulating hand lever of the feeding band
2023-01-03 23:41:526

支撑脚可调节高度,可折叠,可调角度,携带使用更方便的英文翻译

Featuring that the height can be adjustable, collapsible, the angle can be rotated, the support legs is very convenient to carry and use.
2023-01-03 23:42:133

罗勒布雷德·RollerBlade 儿童轮滑鞋尺码谁解释下美国尺码 与国内尺码连线 解答:

Adjustable 2 to 5 指的是“可调整美码2-5号”,对应国内尺码是33-36(其实更准确的说是33.5-37.5),也就是33-36码的小朋友都能穿,因为是可调整的。Adjustable 5 to 8 指的是“可调整美码5-8号”,对应国内尺码是36-40,5,同上,可调整。Adjustable 11 j to 1 指的是“可调整美码11j-1号”,11j后面的“j”是junior的缩写,表示是给年纪更加小的小朋友穿的(同理还有“y”,younger的缩写,一般耐克、阿迪达斯的少年歀都用的是“y”来表示),所以是最小的,对应国内尺码是28-32,同上,可调整。
2023-01-03 23:42:241

可调整大小的戒指 英文怎么说

A ring with variable diameter
2023-01-03 23:42:294

正版MLB 封闭式棒球帽子到底有没有松紧带?都是均码的吗?

1:MLB正品棒球帽有封闭款和可调节款。2:封闭款有不同尺码的也有均码的,不过不叫均码,而叫“flex fit”即弹力,这就是说的有松紧带的了。3:可调节款好像都是“均码”的,不过用词是“adjustable”即可调节的意思。4:所以看到的未必是假的,有可能只是商家货源不足或者没有那几种类型的款式,当然假货的可能也有,毕竟作出的种类越多成本就越高,这是造假者不愿意看到的,总之购买时谨慎一些还是没错的。扩展资料:(1)MLB 是F&F旗下潮流服装品牌,创立于1997年,在韩国拥有超过280家店铺。一直致力于把MLB发展成时尚潮流品牌,于2017年创造了超过270亿韩元的销售额。F&F拥有Major League Baseball(美国职业棒球大联盟)特许经营权。(2)MLB是生活的时尚品牌,MLB是in潮流的帽子的聚集地,拥有亚洲帽子的设计款式,每年,MLB都会在保有300种设计款式的基础上再增加300多种的帽子款式,各类型各季节款,帽子的销售量占比总销售量的50%。参考资料来源:百度百科-MLB
2023-01-03 23:42:446

肩带的英文sloggi

肩带的英文是:shoulder straps. 例句: Both shoulder straps should be used, and adjusted so that the pack fits the body, without hanging to one side. 两个肩带都应该使用,并调整,以便背包适合身体,而不是挂在一边。 扩展资料   The bags have adjustable shoulder straps.   这些包有可调肩带。   The general wore shoulder straps.   这将军带著肩膀皮带。   Adjustable shoulder straps.   可调节的肩带。   Adjustable padded shoulder straps.   可调节加垫肩带。
2023-01-03 23:43:171

this is shoes with adjustable heels这句话语法正确吗

shoes with adjustable heels: 带有可调整后跟的鞋。
2023-01-03 23:43:233

摩托车上的那个可拔上拔下的brake lock是什么用处

应该是副油箱
2023-01-03 23:43:343

“调节性” 英文怎么说?

flexible
2023-01-03 23:43:493

adjustable-strap是什么意思

英文:adjustable-strap中文:可调式肩带很高兴为您解答祝你生活愉快,学习进步如果你对这个答案有什么疑问,请追问如果满意记得采纳哦·~~
2023-01-03 23:44:001

adjustable length什么意思

adjustable length可调长度双语对照例句:1.Adjustable length of bow; adapt to your personal needs. 弓长可调节;满足您的个人需要。2.Diameter, perforation length, and tensility adjustable. 直径、节长、松紧可调。
2023-01-03 23:44:051

adjustable range什么意思

适当的范围
2023-01-03 23:44:113

adjustable screw pole 是什么意思

adjustable screw pole可调丝杆
2023-01-03 23:44:211

转速表、仪表盘、转向盘、可调节座椅、轮胎、尾灯各英文是什么

您好,分别是:(1)转速表tachograph(2)仪表盘dash board(3)转向盘driving wheel(4)可调节座椅Adjustable seat(5)轮胎tyre(6)尾灯tail light
2023-01-03 23:44:272

adjustable heels是什么意思

可调整的鞋跟
2023-01-03 23:44:352

调货架。日语怎么翻译?英语怎么翻译?

‘调货架" 商品棚が 変わります
2023-01-03 23:44:443

直流可调稳压电源用英语怎么说

直流可调稳压电源_译Adjustable dc regulated power supply
2023-01-03 23:44:581

功率可调怎么翻译

power is adjustable
2023-01-03 23:45:041

adjust your goal什么意思

调整你的目标adjustvt. 校准;调整,使…适合vi. 调整,校准;适应时 态: adjusted, adjusting, adjusts 形容词: adjustable副 词: adjustably望采纳~名 词: adjuster
2023-01-03 23:45:101

艾弗森现在穿什么鞋

锐步,第十代了Answer X Pump 艾伦·艾弗森这个天生为篮球而生的小精灵,他的魅力永远是那么无法阻挡。Answer X Pump从2005年就开始成为众多sneakers谈论的话题,这一切都是那么熟悉,从RBK锐步公司为艾弗森推出第一双专署鞋款——Question I开始,他们就从没有停止过对这个系列的鞋和它主人的谈论,甚至出现了很多关于Answer X和艾弗森各种流言,所以这双鞋的推出是真正的万众瞩目。而这次Answer X Pump的推出也正式揭开了那神秘的面纱,露出它的庐山真面目。艾伦·艾弗森之所以得到世界各地球迷的喜欢,正是他身上所体现出的那种与众不同的个性,这次的Answer X Pump的外观设计彻底打破了以往艾弗森篮球鞋的框架,表面大面积色块的巨大反差正是突出艾弗森个性的精神。Answer X采用了RBK锐步公司主打的可调节Pump Adjustable科技,Pump科技重新回到人们视线之后,其强烈的包裹感和舒适性迅速吸引了众多球鞋爱好者的兴趣,可调节的Pump Adjustable让同一款鞋可以适合众多不同类型的脚型。这次可调节的Pump科技成功的再次运用也证明了RBK锐步公司重新将这项科技创新后引入运动鞋中的正确性,而Answer系列也从最初的蜂巢科技——DMX系列——Pump——Pump Adjustable的逐步转变。 Answer X Pump的整体设计主要是借鉴了一种名贵犬种--斗牛犬的诸多元素。众所周知,在艾弗森的左臂就刺有斗牛犬的纹身,而斗牛犬还是艾弗森的母校--乔治敦大学校队的吉祥物,所以一直以来斗牛犬一直是艾弗森最喜欢的犬种。斗牛犬,顾名思义,这样的犬种有着非常优秀的战斗血统和先天的运动技能,他们不仅强壮、顽强、敏捷、忠诚,还有非常好斗、极强的好胜心,这一切品质都非常贴切的与艾弗森在赛场上的表现有着惊人的相同之处。而且设计师在鞋底的部分特别模仿了斗牛犬的脚底纹路设计,打破平鞋底的框框,这样凹凸不平的鞋底设计实际上更能贴和球员的脚底,减去其他不必要的鞋底摩擦,让速度型球员能够更快地加速和变向。同时在艾弗森推出第10双签名鞋的时候,这样一个硬骨头值得纪念的日子,推出以大学母校校队吉祥物为设计理念的球鞋,不仅是是一个回顾,是对母校的一种感谢,同时也预示艾弗森重新以大学新生进入NBA,准备着开创下一个辉煌,或许那将又是一个十年。 辉煌的十年职业生涯都在同一支球队,那是因为忠诚,因为艾弗森就是这里的主人,他深爱着这座从职业生涯一开始就非常能够接纳和给他无限宽容的城市。艾弗森高中的时候就获得过橄榄球和篮球两项州冠军,虽然当年他选择了篮球,但是并不意味着他忘记了橄榄球,作为费城的主人,他还是NFL的费城老鹰队的超级球迷。为此,RBK锐步公司还特别推出了费城老鹰队配色的特别版Answer X Pump,这也是对艾弗森所热爱的这座城市的一种致敬。 Answer X Pump上市日期: 黑/红/白 配色 11月3日 白/宝蓝/黑 配色 12月8日 白/灰绿/黑(NFL费城老鹰队)配色 11月24日http://www.soucou.com/dddweb/about/rbk_061113.html
2023-01-03 23:45:151

高考常用的英语词形变换

动词变名词1.v+ ment 结尾achieve---achievement成就advertise---advertisement// advertisingagree— agreementapartment 公寓amusement 娱乐argue---argument争吵commit奉献—commitmentcompliment 称赞,恭维develop---developmentdisgree—disagreementdepartment 局,部experiment 实验,试验equip 装备---equipment 装备,器材 govern 统治—government 政府manage---management经营管理2.V+ tion 结尾admit 承认—admissionattract吸引—attraction有吸引力的事或人;令人向往的地方conclude—conclusion 结论compete—competition 竞争,比赛discuss—discussion讨论educate-----educationdecide----decisiondescribe—description描写,描绘express 表达----expression 词语;表达方式graduate 毕业—graduationoperate 操作,动手术—operationorganize----organizationimagine—imagination想象力introduce—introduction介绍instruct—instruction 指导,介绍invent—inventor / inventionillustrate 阐明,举例说明--illustrationinvite—invitationinspire---inspiration灵感,鼓舞人心的---pollute----pollution污染predict---prediction预言 pronounce---pronunciation resolve 决心-----resolution 决心impress 给人印象—impression 印象permit 允许-----permissionsuggest-建议,暗示--suggestion solve解决-----solution 解决方法3.V+ ance 结尾allow—allowance 允许appear—appearance外貌,出现perform----performance 演出exist—existance 存在4.V+ ing 结尾bathe 洗澡---bathingend 结束----ending 结尾,结局train 训练---trainingmean ---- meaning 意义say-----saying 谚语5.V+ 其他Beg(乞讨)—beggar 乞丐sit--seat 座位employ--employer 雇主,老板--employee雇员believe—belief 信仰behave 行为,举止----behaviorknow---knowledgefly—flight 飞行heat 加热---heat 热量hit 撞击------hit 轰动一时的人或物,碰撞mix 混合-----mixture 混合物press 按,压—pressure 压力receive—receptionist接待员serve—service 服务succeed-- successtour 在-----旅游,在-----作巡回演出直接+地点 tour China ---tour 旅游/ tourist 游客pursue—pursuit 追求,从事propose—proposal 建议withdraw—withdrawal取钱;收回;撤退survive—survival--survivor幸存者arrive-- arrival到达analyze—analysis 分析名词变形容词1名词+yanger 生气-----angryhonest—honesty 诚实的hunger---hungryfog—foggy有雾的fur----furry 毛皮的guilt 罪恶---guilty 内疚的health---healthyluck---luckycloud---cloudywind—windyrain---rainysnow---snowysun—sunnytourist------touristy游客多的business---busysalt 盐--- salty 咸的shine---shiny 发亮的silk 丝绸—silky 丝绸般的sleep---sleepy 昏昏欲睡的taste 口味,品味------tasty 甜的2.名词+ edbalance –balanced 平衡的spot 斑点,地点----spotted 有斑点的talent-----talented有天赋的organized 有组织的distusted 厌恶的offended 生气的crowded 拥挤的polluted 被污染的pleased 高兴的3.名词+ ful/lessmeaning—meaningful有意义的care—careful/careless 小心的;粗心的help---helpful /helplesshome—homeless 无家可归的colour---colourfulpain 疼痛---painful 痛苦的use---useless/usefulthank—thankful 充满感激的peace 和平 ---- peaceful 平静的,宁静的playful 顽皮的,爱玩耍的4.名词+ ableadjustable 可调整的comfort---comfortableknowledge---knowledgeablesuit 一套-----suitable 合适的5.名词+ ouscourage—courageous勇敢的danger—dangerousmystery 神秘-----mysterious 神秘的6.ce 变 tconfidence----confidentdifference---differentdependence—dependentindependence--independent7. al 结尾Addition—additional附加的,额外的Class—classical 经典的medicine 药----medical 医学的music---musicalnature---natural 自然的person---personal(私人的)nation—national 国家的education---educational有教育意义的tradition----traditional传统的origin起源---original 新颖的;独创的grammar—grammatical语法的globe—global 全球的8.名词+ lyfriend—friendlylive---lively 活跃的,有生气的love—lovely 可爱的9.+ en 结尾wood—wooden 木制的wool—woolen 羊毛的10. 其他energy精力---energeticstrategy—strategic战略的fool 傻子—foolish 愚蠢的freedom 自由—free 空的,免费的height 高度—highillness 疾病--- illlove—loving 慈爱的death---deadpleasure---pleasant/ pleasedpopularity 流行性—popularpride---proudscientist----scientific科学的形容词变副词1.形容词+lybad—badlybright—brightly 明亮地casual—casually 随意地clear—clearly 清楚地complete—completely完全correct---correctly正确地final--finallyfortunate—fortunately幸运地general—generally 一般来讲loud—loudlyparticular 特殊的,独特的—particularlypolite—politelyproper 合适的-,恰当的---properlymain------mainly 主要地most 多数-----mostly 多半,大多数normal---normally 正常地quick—quicklyquiet—quietly 轻轻地,安静地real—reallyrecent 最近的----recently 最近;近来hard 难的;努力地---hardly 几乎不late 迟的—lately 最近;近来sad--sadlyslow---slowlyspecial—specially 专门,特殊地specific---specifically特定地,明确地strong—strongly 坚决地,强烈地sudden—suddenly突然usual—usually2. 以le 结尾的去e + ycomfortable---comfortablygentle—gentlypossible---possiblysimple ----simply 仅仅;只;简单地terrible---terribly3. 辅音字母+ y 变 ilyeasy—easilyheavy—heavilyhappy--happily4.特殊good—well好地 well 身体健康的,井true—truly形容词变名词efficient有效率的—efficiency 效率patient—patience/impatiencedependent—dependenc依赖性independent—independency独立性true—truthhigh—heightwide—widthlong—lengthpossible—possibilityresponsible—responsibilityurgent—urgency 紧急prosperous—prosperity繁荣accurate—accuracy 准确性形容词变动词modern—modernize social--socializefast--fasten short/shortenlong—lengthen—length(n.) wide--widenless--lessen strong—strengthen—strength(n.)large—enlarge名词变动词computer--computerize名词---形容词—副词beauty 美,美人—beautiful—beautifullycare—careful—carefullycare—careless—carelesslydifference---different---differentlyfortune—fortunate—fortunately/unfortunatelyhappiness—happy—happilyhunger—hungry--hungrilyhealth—healthy—healthilyluck—lucky—luckilynoise—noisy—noisilypride—proud—proudly骄傲地sadness—sad—sadlysafety 安全;安全的地方—safe—safelysilence—silent---silently默默地success—successful—successfullytruth—true—trulyunluck—unlucky—unluckilywonder 奇迹—wonderful—wonderfully方位的词 名词—形容词East—easternWest—westernSouth—southernNorth---northernIn the west ofChinaIn the westernpart of China四大洲 名词-----形容词Asia 亚洲–---- Asian Africa 非洲----- AfricanEurope欧洲----- European America 美洲-----American既是形容词又是副词early get up early ; anearly trainlate be late for classcome late for schooldeep dive deep into the seaa hole deep largehigh jump high; a high mountainhard a hard question;a hard stonework hard / study hardrain hardlong It takes too long It takes a long timefar jump far My home is far from schoolstraight a straight line go straight along hereGroup11.actionn.行动actvt.做事,表演,演出activeadj.积极的,主动的actorn.演员activityn.活动2.Africanadj.非洲的,非洲人African.非洲3.apologizev.道歉apologyn.歉意4.angryadj.生气的,愤怒的angern.生气,愤怒5.agreementn.同意agreev.同意6.anxiouslyadv.焦急anxiousadj.焦急的,忧虑的anxietyn.急于,不安,忧虑7.attendvt.出席,关心,照料attentionn.出席,关心,注意attentiveadj.专心的attentivelyadv.专心地8.achievevt.实现,取得,达到achievementn.成功,胜利,目标9.absencen.缺席,不在absentadj.缺席的10.arrivaln.到达,来到arrivev.到达,来到11.basicadj.基础的,根本的basev.以...为基础basen.基础,根本,基地12.bathn.洗浴,洗澡bathev.洗澡,游泳13.beautifullyadv.美丽地,漂亮地beautifuladj.美丽的,漂亮的beautyn.美丽,漂亮14.breathn.呼吸breathev.呼吸15.believableadj可信的believev.相信beliefn.信仰Group21.chemistn.化学家chemicaladj.化学的chemistryn.化学2.correctvt./adj.改正,/正确的correctionn.正确,改正correctlyadv.正确的3.concludevt.推断,总结conclusionn.结论,总结conclusiveadj.决定性的4.connectv.联系,连接connectionn.联系,连接5.comfortvt.安慰comfortableadj.舒适,舒服comfortablyadv.舒适地,舒服地6.choosevt.选择choicen.选择7.celebratevt.庆祝celebrationn.庆祝8.centren.中心,中央centraladj.中心的,中央的9.completevt.完成completeadj.完全的,完整的completelyadv.完全,完整10.crossv.横过,跨越crossingn.路口acrossadv.横过,跨越11.certainadj肯定,当然,有把握certainlyadv.肯定,有把握certaintyn.肯定,当然,有把握12.diev.死deathn.死亡deadadj.死的dyingadj.将死的deadlyadj.死一样的,致命的13.distantadj.遥远的distancen.距离,遥远14.dirtn.脏,灰尘dirtyadj.脏的15.developvt.发展,进展,培养developmentn.发展,进展developingadj.发展中的developedadj.发达的16.defendv.保卫,保护,捍卫defensen.保卫,保护,捍卫17.darkadj.黑的,黑暗的darknessn.黑暗darkenv.使变黑18.directionn.方向,指向,指示directadj.直接directlyadv.一直19.dangern.危险dangerousadj.危险的dangerouslyadv.危险地20.discussvt.讨论,谈论discussionn.讨论,谈论21.discovervt.发现discoveryn.发现
2023-01-03 23:45:211

有调整后跟的鞋子 用英语怎么说

shoes with adjustable heelsadjustable 可调整的 (形容词)heel跟(名词)这是九单元学的重要词组
2023-01-03 23:45:262

hdjustable 是什么意思

adjustable英 [əˈdʒʌstəbl] 美 [ə"dʒʌstəbḷ]adj.可调整的,可调节的1. The bags have adjustable shoulder straps. 这些包的肩带可以调整。来自柯林斯例句2. The height of the bicycle seat is adjustable. 这辆自行车车座的高度可以调节。
2023-01-03 23:45:351

The police are ____(调查)the case.

look into 是寻找adjustable 时可调整应该用survey
2023-01-03 23:45:402

人教版九年级英语词汇

恩,你想问词汇的什么呢?记忆还是其他什么啊。
2023-01-03 23:45:522

三端可调节正电压稳压器英语怎么说

准确的是:3-Terminal Positive Adjustable Regulator一般都说:3-Terminal Adjustable Regulator复杂一点的是:3-Terminal Positive Voltage Adjustable Regulator,或者Adjustable 3-Terminal Positive Voltage Regulator
2023-01-03 23:46:011

真正的艾弗森球鞋10代,一双多少钱?

1999
2023-01-03 23:46:073

三档调节风量大小怎么用英语表达

三档调节风量大小Adjustable air volume 重点词汇释义风量blowing rate; air quantity大小size; big or small; degree of seniority; adults and children; bulk
2023-01-03 23:46:181

可调节纽扣 翻译成英语怎么说呀

the adjust button
2023-01-03 23:46:242

adj在石英钟上什么意思

这个 adj是adjustable 可调整的如果有帮助的话请采纳一下~如果有疑问,请追问吧~~
2023-01-03 23:46:331

tunable是什么意思及反义词

可调谐; 可调的Adjustable
2023-01-03 23:46:392