barriers / 阅读 / 详情

"业绩提成"用英语怎么说

2023-07-30 02:49:51
TAG: 英语
共9条回复
CarieVinne

通常是"bonus"或者说的清楚一点是"All bonus according to your achievement".现在外企多了起来也应用国外的叫法"Sales Commission"

bonus直接翻译过来中文应该是“奖金”,这个是比较中国式的说法,在国外/外资公司bonus一般是指每年年终的时候,管理阶层会根据业务员的表现,一次性的,或是根据全年总销售额的一个比例,发给业务员的“奖金”bonus。英语里面,“业务提成”是用“销售佣金”来说的,就是:Sales Commission。

还有一个相关词Rebate,是回扣,这个在中国的外资公司比较忌讳,可是在国外rebate是volumn rebate,就是零售商/经销商日常取货时,是按照一定的货价交付货款,但是如果取货量在某段时间内达到某个金额,譬如说1年内是超过10万元,就可以得到总代理方面给出,额外的百分之2、3、5个点的“回扣”volumn rebate

LocCloud

"业绩提成" = Deduct a percentage in achievement

左迁

extra payment of sales

我是这么理解的

可可

Performance commission

clou

就是commission,佣金

瑞瑞爱吃桃

Performance commission

蓓蓓

achievement commisions

真可

reward

FinCloud

earning royalty

相关推荐

commissioning是什么意思

commissioning[英][ku0259"mu026au0283u0259nu026au014b][美][ku0259"mu026au0283u0259nu026au014b]n.试运转,试车; 启动; 双语例句1Where applicable the service contract number and contact point for the supply of commissioning spare parts shall be listed.若适用,应列出供应试车备件的服务合同号和接触点。
2023-07-29 12:06:211

commissioning是什么意思

昧炙要膑 中膦奇巧
2023-07-29 12:06:303

commission是什么意思

commission委员会双语对照词典结果:commission[英][ku0259u02c8mu026au0283n][美][ku0259u02c8mu026au0283u0259n]n.委员会,委员; [商]佣金,手续费; 任命,委任; 委任状; vt.委任,授予; 使服役; 使(船)服役; 第三人称单数:commissions复数:commissions现在进行时:commissioning过去式:commissioned以上结果来自金山词霸例句:1.Consider the unelected european commission. 想想那个非民选的欧盟委员会吧。
2023-07-29 12:06:401

Commission是什么意思?

同学你好,很高兴为您解答!    Commission佣金您所说的这个词语,是属于CFA词汇的一个,掌握好CFA词汇可以让您在CFA的学习中如鱼得水,这个词的翻译及意义如下:代理人就安排购买或出售证券或房地产而收取的费用。佣金必须公平及合理,考虑到交易的所有因素。不同经纪行收取的佣金存在很大的差异  希望高顿网校的回答能帮助您解决问题,更多FRM问题欢迎提交给高顿企业知道。高顿祝您生活愉快!
2023-07-29 12:06:472

冷试车,热试车,试生产,在中国规范中是如何定义的

相对于国内化工而言:冷试车:即是联动试车,不带物料的系统试车。commissioning热试车:即是投料试车,带物料的系统试车,将会产生化学反应。start-up国内的单机试车,即是预试车,预试车完成达到机械竣工、中间交接,具备联动试车条件。预试车包括了各个专业的单机试车、调试、试验等。precommissioning不妥之处请指正。
2023-07-29 12:07:112

机械设备调试的“调试”英文用什么单词

机械设备调试,定期的调试吧。定期调试 periodic calibration调试 n. calibration / calibration and testing调试 v, calibrate and testcalibrate v.tr. cal.i.brat.ed; cal.i.brat.ing; cal.i.brates;To check, adjust, or determine by comparison with a standard (the graduations of a quantitative measuring instrument): 校准校核、调整或通过与一标准比较而确定(量化仪表上的标度):calibrate a thermometer.校准一支温度计To determine the caliber of (a tube).确定(管道的)口径To make corrections in; adjust: 使标准化对…作校正;调整:calibrated the polling procedures to ensure objectivity.为保证客观性而使投票过程标准化
2023-07-29 12:07:224

启动的英语翻译 启动用英语怎么说

Boot up
2023-07-29 12:07:322

commissioning test是什么意思

运行试验,交接试验。。。
2023-07-29 12:07:413

请问EPC和EPCC分别是什么意思,有什么区别

EPC是总承包管理模式,EPCC是进行这种管理模式而成立的公司。最后一个C就是“公司”company的缩写。
2023-07-29 12:07:515

wet commissioning&dry commissioning怎么解释?

wet commissioning&dry commissioning湿调试与干通车
2023-07-29 12:08:222

for installation and commissioning是什么意思

for installation and commissioning安装和调试双语例句1Discussion on Norms for Installation and Commissioning of Intelligent Transmitter智能变送器安装调试定额探讨2The Seller guarantees that the special tools it provides for installation and commissioning will meet the requirements therefor of the site.卖方保证向买方提供的安装调试专用工具符合现场安装调试要求。
2023-07-29 12:09:281

委托单 英语怎么说 commissioning sheet

委托单order ticket更多释义>>[网络短语]委托单 Trust Deed;buy limit order;Commission Sheet选择性委托单 One Cancels the Other Order;OCO系列检测委托单 ISTA
2023-07-29 12:09:381

commissioned-by是什么意思

commissioned by由.......委托双语例句1The system will be commissioned by Siemens and handed over as a turnkey solution.该系统将由西门子负责试运行,而且将作为一个全承包解决方案移交。2This is like a home-buyer relying on an inspection report commissioned by the seller.这就好比一位买房者信赖一份由卖房人委托出具的检验报告。
2023-07-29 12:09:471

合同中卖方责任义务的条款英文翻译

The seller"s responsibility and obligation 2.1 to ensure that the seller of this contract, according to the contract requirements in a timely manner to the right to carry out its responsibilities and obligations of the contract until the completion of the mission. 2.2 The seller of the contract supplier of equipment within the framework of the manufacturing process technology. The main components of the selection of materials. Outside of the main pieces of matching the quality. The quality of the equipment supplier. Supplier of equipment reliability and integrity."s Equipment delivery to the buyer In charge. If the seller due to the errors suppliers reasons, the seller should be followed up with the timely and correct, the economic losses caused by the seller to bear. 2.3 In accordance with the buyer or the seller should be designated owner and design technical parameters and requirements for the design of equipment and facilities in accordance with the technical requirements for equipment manufacturing and information technology standards for manufacturing and testing. 2.4 The seller should be based on the terms of the contract the scope of supply and delivery progress of the buyer to provide quality equipment and services, and by 2 years to provide preferential market price of spare parts. 2.5 the seller under the contract should be asked to participate in the commissioning of the equipment contract. Commissioning. Load testing and inspection equipment such as the handover, and to send experienced technicians to carry out technical services, to address the issue. In the meantime, the seller should send a relatively fixed and, if adjusted, with the consent of the buyer"s consent before they are allowed to adjust the personnel. If the seller in the implementation of technical services, technical guidance and led to the failure of the contract to install equipment, test and debug the failure of the work, resulting in project delays or rework, the buyer for losses caused by the seller to bear. 2.6 by the seller for equipment and components. Supporting parts or pieces, such as less than standard of acceptance by the buyer in the agreement, the seller should be repaired in a timely manner. Replacement; if there are some omissions should be added in a timely manner. Resulting from the seller to bear the loss. 2.7 The main equipment contracts in the factory before the seller in the factory pre-installed equipment. 2.8 In addition to the clear provisions of this contract, the seller in the procurement of items outside the package, the buyer should be consulted and approved by the buyer only after the purchase, if necessary, co-organized plant inspection to confirm the election. 2.9 deal with the seller or buyer to provide technical drawings of confidential information, without allowing the buyer may not be transferred to any other third party liability arising from the seller is responsible. 2.10 seller to the buyer must provide the equipment manufacturing factory in the processing, can not subcontract. Assignment of the contract. 2.11 pair of the implementation of the contract the seller to the buyer of the persons concerned, the seller should provide the work. The convenience of their daily life. 2.12 Sellers have to protect the buyer in the use of their goods. And its services are not part of any third party regarding patent infringement. Trademark or industrial design rights charges. If any third-party infringement allegations made, the seller shall negotiate with third parties and hence to assume all liability and costs. 2.13 pair of related to personal and environmental protection equipment and special equipment, such as equipment, pressure vessels. Fire-fighting equipment. Electronic alarm and explosion-proof electrical equipment, such as belonging to the seller of the scope of supply, according to the national authorities of relevant laws and regulations, the seller to provide Permits for the use of the information required by the seller to the relevant state department in charge of inspection, and apply for the permit. 2.14 seller to the buyer of the equipment on a contract to provide monthly progress of each month.
2023-07-29 12:09:571

英语翻译,谁知道这个是什么意思 “It should be a Complete Line , Which includes Installation & ”

调试机
2023-07-29 12:10:428

英语翻译,请高手帮忙!

u huang high-speed management premises wu over yellow expressway is totally 70.3 highway, in 1991, was opened to traffic commissioning in henan province article first self-raised funds, to design and facilities of the provincial highway, is known as "first all the way." chutianBe responsible for a full line of fee wu huang highway, highways, maintenance, the industry development and management work. Since 2003, wu yellow since its establishment, the company constantly improve traffic environment and improve the service quality fluctuation kongfu, obtained "four new" (road station, new, new new, worker spirit new) and "two improvements" (economic benefit and social benefit increase) improve results.In 2005, wu yellow company actively support the loan to WuDong toll, and authority, new WuDong move implement whole ? toll station
2023-07-29 12:10:594

系统开局流程,开局怎么翻译成英文?是电信方面的 另,设备开通,开通怎么翻译?也是电信方面的。谢谢!

系统开局流程:没有听过,无从翻译设备开通:equipment running希望给出具体应用的资料,才好翻译。
2023-07-29 12:11:072

帮忙翻译一下商务合同

The seller is responsible for the equipment in the installation and commissioning on site, and the relevant personnel to operation and maintenance training.If the buyer has the problem in the use process, the Seller shall be responsible for and contact manufacturers, and promptly solve problems.
2023-07-29 12:11:167

负责设备调试 用英语怎么说

翻译如下:负责设备调试Responsible for equipment commissioning例句:负责设备的安装调试,开展设备的维修和保养工作。Be responsible for the installation and organizing the mechanical reparation, making the preventive maintenance program.
2023-07-29 12:11:321

求翻译!中文简历翻译成英文简历

简历寻求的是简单明了,能够让观看者一看就略知大意.主要是英文简历,更需要在精确中找关键.楼主呀!这么长的简历观看者实在找不出关键所在呀...Graduate school: Shaoyang, Hunan College Professional: Electrical Engineering and Automation The workplace: the city of Chenzhou Current position: production technology and operation of the Department of transforming the Select Self: I cheerful personality, stable, vibrant, warm and others, in good faith. A serious and responsible work, take the initiative to hard-working. Strong organizational capabilities, hands-on practical ability and collaborative spirit of the group, quickly adapt to the environment and integration of them. Working experience: 2 years working experience so far, in 2 company in Hunan Province where power group Zixing 2006-07 --- 2007-07Company nature: motivation, power Positions as: college students a year internship rotation Job description: the company"s new arrangements for university students a year internship rotation. 2006.7-2006.9 Power Marketing. To study business marketing; 2006.9-2006-11 measurement center. Measuring learning management and installation; 2006.11-2007.1 change control center on duty substation. 2007.1-2007-3 dispatch center, dispatch duty 2007.3-2007.5 installation, and engaged in transforming the installation of lines 2007.5-2007.7 substation maintenance classes, to engage in 10KV substation equipment maintenance. Hunan Province, local power groups Zixing 2007-07 --- 2008-09 Company nature: motivation, power Positions as: transformation and operation of the SelectDescription of the work: in July 2007 after the power company engaged in transforming the Department of Biotechnology and operation of a select, in charge of bidding for electrical equipment, installation and management. Engaged in the protection of computer technology and control system design, transforming substation projects and maintenance, installation, commissioning, to participate in the management and mining-related work for. Substation of the sensors, transmitters, control instrumentation, PLC, inverter, the implementation of the device, and single-chip electronic circuits such as the more familiar, in the electric power supply systems and power supply system designed and put forward effective solutions. Large-scale facilities for air-conditioning, refrigeration, HVAC water and electricity, are more familiar with the electric system, designed to make the necessary transformation. Strong management, organizational capacity and the spirit of teamwork, solid practice, practice and innovation. Keen on writing and calligraphy, in units in the school magazine and newspaper published several articles, a positive thought. Familiar with the electrical, electronic and control system circuit design, good PLC and programmable controllers and application of traditional relay control circuit, the DCS system to understand the basic principles and common sense. Educational background Shaoyang in Hunan Institute of 2002-09 --- 2006-09Professional: Electrical Engineering and Automation Skills, expertise skills expertise: the country has passed through four English exam, has a certain ability to read and write English listening and speaking; and to be able to master the use of computers, has been adopted by the National Computer Rank Examination II C language; skilled to carry out the use of CAD drawing; proficient Siemens S7-200 PLC, to carry out skilled programming configuration, Understanding of the S7-300; familiar with Omron, Mitsubishi PLC; familiar with the Zhejiang University in control JX-300X distributed control system (2005 1-3 last month in Hunan University in control training); skilled to carry out chemical process design configuration, In the transformation of the company"s equipment in the completion of an independent high-pressure compressor of chlorine PLC design, with the cooperation of others to complete its process and the configuration between DCS and PLC communications; familiar with the chemical electric instruments, most of the instruments on the fault has a certain ability to deal with; familiar with the electrical counter; In January 2007 in the Zixing Electric Power Group Corporation as a workshop instrument technicians, the company had participated in the 2007 JIN Lei 110KV substation in the planning and construction work (electrical instruments). In the work the company had received "excellent technicians," a "technical transformation of equipment capable of" one. In July 2007 after the power company engaged in transforming the Department of Biotechnology and operation of a select, in charge of bidding for electrical equipment, installation and management. The level of language: English proficiency Cover letter anxious to join the distinguished leadership of your company: Hello! Thank you for taking the time out to review my resume! I graduated from Hunan Shaoyang study electrical engineering and automation professional, you know Fresh Talent as a science and electrical fans, I have a sincere desire to be able to join your company, your company"s growth and can contribute to my Wisdom. Together with a curriculum vitae, please read for you, finally, once again thank you and prays for your response! Wish you every success cause! Sincerely Salute Job: + + + 2008 on Sept.
2023-07-29 12:12:083

paid on commission是什么意思

paid on commission 支付佣金A fee or commission paid to a broker.佣金付给中间人的手续费
2023-07-29 12:12:332

纪委书记室的翻译是:什么意思

纪委书记室翻译成英文是:Secretary of the commission for discipline inspection room 相关单词学习:commission 英[ku0259u02c8mu026au0283n] 美[ku0259u02c8mu026au0283u0259n] n. 委员会,委员; [商] 佣金,手续费; 任命,委任; 委任状; vt. 委任,授予; 使服役; 使(船)服役; [例句]The Ministry of Agriculture commissioned a study into low-input farming农业部委托对低投入耕作进行研究。[其他] 第三人称单数:commissions 复数:commissions现在分词:commissioning 过去式:commissioned discipline 英[u02c8du026asu0259plu026an] 美[u02c8du026asu0259plu026an] vt. 训练; 使有纪律; 处罚; 使有条理; n. 纪律; 学科; 训练; 符合行为准则的行为(或举止); [例句]Order and discipline have been placed in the hands of headmasters and governingbodies.维持秩序和纪律的工作已交接给了校长和管理机构了。[其他] 第三人称单数:disciplines 复数:disciplines 现在分词:disciplining过去式:disciplined 过去分词:disciplined inspection 英[u026anu02c8speku0283n] 美[u026anu02c8spu025bku0283u0259n] n. 检验; 检查; 视察; 检阅; [例句]The report sets out strict inspection procedures to ensure that the recommendations are properly implemented.报告规定了严格的检查程序,以确保建议得到切实执行。[其他] 复数:inspections
2023-07-29 12:12:401

“EPC”和“EPCC”的意思及区别分别是什么?

EPCC最后一个C不是company,而是commissioning,意思是试车。
2023-07-29 12:12:503

commission 在记录数据中是什么意思

commission[英][kəˈmɪʃn][美][kəˈmɪʃən]n.委员会,委员; [商]佣金,手续费; 任命,委任; 委任状; vt.委任,授予; 使服役; 使(船)服役; 第三人称单数:commissions复数:commissions现在进行时:commissioning过去式:commissioned以上结果来自金山词霸例句:1.The commission expects a further increase in 2006. 委员会希望在2006年会有进一步增长。.-----------------------------------如有疑问欢迎追问!满意请点击右上方【选为满意回答】按钮
2023-07-29 12:13:001

请教“投产”一词用英语怎么说

投产[tóu chǎn]go into operation; put into production in commission; completion and commissioning; [油工]blow in
2023-07-29 12:13:091

合同能源管理项目合同 哪位大神帮忙翻译一下。跪求。跪求。不胜感激

本合同双方同意按“合同能源管理”模式就 A公司(B厂房屋顶)分布式光伏发电 项目(以下简称“项目”或“本项目”)进行专项节能服务,并支付相应的光伏电费。The parties agree that this contract according to the "contract energy management mode" is A company (B workshop roof) distributed photovoltaic power generation projects (hereinafter referred to as the "project" or "the project") in energy-saving services, and pay the corresponding pv electricity.乙方利用甲方厂房屋顶(屋顶非甲方自有产权的,由甲方征得房东同意取得建设光伏许可,屋顶租金等事项由甲方自行与房东协商解决)约 30000 m2建设约 3500 kWp(以实际利用面积和实际装机容量为准)屋顶太阳能光伏发电项目,双方经过平等协商,在真实、充分地表达各自意愿的基础上,根据《中华人民共和国合同法》及其他相关法律法规的规定,达成如下协议,并由双方共同恪守。Party b USES party a workshop roof (the roof of party a"s own property, by the party a"s consent of the landlord agreed to acquire the license of the building photovoltaic roof by party a to negotiate with the landlord to solve issues such as the rent) of about 30000 m2 construction about 3500 kWp (at the actual capacity in actual use area and) rooftop solar photovoltaic power generation project, both parties through equal consultation, in the real, on the basis of fully express their will, according to the law of the People"s Republic of China contract law and other relevant laws and regulations, the following agreement, and abide by jointly by both sides.1、合作模式1, the cooperation pattern1.1乙方负责本项目的投资、建设、运营、维护及管理工作;1.1 party b is responsible for the project investment, construction, operation, maintenance and management work;1.2甲方为乙方提供项目建设场址及施工便利、日常运行维护方便;1.2 party a provide party b with the construction site and the construction is convenient, daily operation, maintenance is convenient;1.3 项目采用“自发自用,余电上网”的方式,甲方应优先使用本项目所发的电力,乙方给予甲方电价优惠。More than 1.3 projects adopt "spontaneous for private use, electricity on the Internet", party a shall first use the project issued by electricity, party b gives party a price discount.2、合同期限2, the contract deadline2.1双方合同期限自 本协议双方盖章签字之日起 至 效益分享期满止 。在此期间,任何一方发生分立、合并情形,本协议对各方权利义务承继者继续有效;2.1 the contract period from the date of signing this agreement both parties seal to the expiry of the benefit sharing. During this period, either party, upon divest, merge, custodians of the rights and obligations of the parties to this agreement;2.2本项目的节能效益分享期的起始日为 项目建成投产日(电力局安装计量表日期),效益分享期为 25年。合同期满后,如双方决定终止合作,设备由乙方负责在一个月内转移或处置,相关费用由乙方承担。如果在拆除过程中对甲方房屋造成损坏的,乙方有义务进行维修,如乙方拒不维修的甲方有权指定供应商对损坏部分进行维修,乙方承担相关费用。2.2 the beginning day of energy-saving benefit sharing in the project for the project completed and put into operation (electricity meter installation date), benefit sharing period for 25 years. After the expiration of the contract, such as the two sides decided to break up, equipment by party b is responsible for the transfer or dispose of in a month, the relevant expenses shall be borne by party b. If damage is caused to party a in the process of demolition of houses, party b shall have the duty to repair, if party b refuses to repair, party a has the right to specify the supplier to repair the part damaged, party b bear the relevant expenses.2.3效益分享期满后,双方重新商讨是否继续使用,决定继续使用的,双方重新签订合作协议。2.3 after the expiry of the benefit sharing, the two sides to discuss whether to continue to use again, decided to continue to use, the two sides signed a cooperation agreement.2.4效益分享期间,有下列情形之一,双方合作依法终止,但本项目中乙方投入部分、涉及该项目相关的拆迁、征用等第三方赔偿费全额归乙方所有:2.4 during the benefit share, any of the following circumstances, the two sides cooperation terminated in accordance with the law, but party b in this project invested part, involved in the project related units, such as requisition compensation by a third party all owned by party b:1) 该场地的房屋占用范围内的土地使用权依法提前回收的;1) the ground of the housing land within the area of recycling in advance in accordance with the law;2) 该场地的房屋因社会公共利益被依法征用的;2) the ground of the housing for the social and public interests are in accordance with the requisition;3) 该场地的房屋因城市建设需要被依法拆迁的;3) the ground of the housing for the demolition and relocation of urban construction need to be in accordance with the law;4) 该场地的房屋因城市规划调整依法需要改变用途或重建、改建,致使本项目整体无法正常运行。4) the ground of the housing for the city planning adjustment needs to be changed in accordance with the purposes or reconstruction, rebuilding, the normal operation of the whole project.5) 甲方破产、解散、清算:乙方负责拆除属于乙方的资产5) bankruptcy, dissolution and liquidation: party a party b is responsible for the demolition belongs to party b"s assets6) 甲方租赁厂房的在合同约定期间内,由于房东或甲方经营原因不能继续租赁厂房的,甲方提前通知乙方,并协助乙方拆除,拆除光伏电站所产生的人工费由甲乙双方各自承担一半。6) plant during the period of the contract, party a lease with the landlord or party a"s business cannot continue to lease plant, advance notice to party b, party a and assist party b to demolition, demolition of photovoltaic power station half artificial cost borne by both parties respectively.7) 乙方太阳能发电的电能质量不能满足甲方需要的供电安全和电能质量的(以国家及电力行业相关标准为准),乙方限期整改,整改后仍然不符合要求的,甲方有权提出终止合同。7) power quality can"t meet the requirements of party a party b solar power supply safety and power quality of subject to state and the electric power industry standards (), party b rectification within a time limit, still do not meet the requirements after rectification, party a has the right to terminate the contract.3、节能效益分享方式3, the energy-saving benefit sharing way效益分享期内,“自发自用”部分的电量,甲方以同期同时段电网电价*0.83*0.9 (开具形式发票)的价格向乙方支付其使用的本项目所发电力费用作为光伏电费。如果电网电价出现变动时,以变动实施之月开始改变。Period of benefit sharing, the spontaneous self-used section of electricity, party a to the same period and period of grid electricity price * 0.83 * 0.9 (proforma invoice) to party a shall pay party b the use of the project electricity charge as pv electricity bills. If changes in grid electricity price, in order to change the implementation of the month began to change.(注:在项目完成施工开始试运行发电至电力局安装计量表期间,甲方以电网电价0.53元/度 的价格向乙方支付光伏电量费用,计量方式以乙方施工完成日安装的电表进行计量)(note: at the beginning of the project construction between power generation and electricity meter installation commissioning, party a to grid electricity price 0.53 yuan/degree price to party b to pay the cost of photovoltaic power, measurement methods with party b construction to complete the installation of meter for measuring)甲方所使用的本项目所发电力电量=光伏发电全部电量(以并网侧电力公司计量表为准)-光伏上网电量(以电力公司上网计量表为准)。甲方应在每月20日前向乙方支付上月的光伏电费。增值税抵扣部分已在电价中给予甲方17%的减免,因此乙方只向甲方开具形式发票。Party a by the use of the project on power = all photovoltaic power (the grid side power company meter shall prevail) - photovoltaic battery online (the power company online meter shall prevail). Party a shall pay to party b before 20 a month of pv electricity last month. VAT deduction part has give party a 17% reduction in price, so party b only to the proforma invoice issued by party a.
2023-07-29 12:13:431

珠海市理工职业技术学校(斗门校区)的声誉美好

2001年学校被确定为广东省首批职业教育“实训中心”,2005年被认定为国家级重点中等职业学校;是珠海市规划创建为国家级示范中等职业学校的三所职中之一。曾被评为“全国艺术教育先进单位”、省“先进集体”,市、区“模范集体”、“文明单位”和“德育工作先进单位”,区“教育科研先进单位”等;先后获市教学质量一、二等奖和市高考质量一、二等奖;“电子技术应用专业”和“汽车与维修应用专业”、“电气技术应用专业”为省重点专业,“计算机应用专业”为市重点专业。2009年以来学生参加省级技能大赛屡获佳绩2011年与珠海市理工职业技术学校合并且成为其斗门校区。2011“机电一体化设备组装与调试”竞赛第一名,并代表广东省参加国家技能大赛;“楼宇智能化系统安装与调试”和“电子产品装配与调试”获二等奖。校内设有国家职业技能鉴定所。2011年1月,学校被教育部确定为首批“国家中等职业教育改革发展示范校”立项建设学校。2011年,被确定为 “广东省职业院校三二分段自主招生试点学校”。2012年被环保部授予“全国中学生水科技发明比赛”项目试点学校。Better reputationIn2001 the school was identified as Guangdong Province, the first batch of vocational education training center2005 was identified as national key secondary vocational schools; Zhuhai City Planning created as a national model of secondary vocational schools in one of three grades. Has been named the National Art Education advanced unit, collective model province advanced collectives, city, district, Civilization and moral education advanced unit area education and scientific research advanced units; has won the City the quality of teaching, the second prize and the quality of a city entrance, second prize; electronic technology professional and car repair applications and professional, Electrical technology professional as the focus of professional province, computer Application for the city key professional.Students participating in the provincial skills competition awarded medals since 20092011 and Zhuhai City Polytechnic Vocational Technical School and became its co Doumen district.2011 mechatronics equipment assembly and commissioning, the first race, and on behalf of Guangdong Province to participate in the National Skills Competition; intelligent building systems installation and commissioning and electronic product assembly and commissioning, won the second prize. The school has the National Occupational Skill Testing.January 2011, the Ministry of Education school was identified as the first national secondary vocational education reform and development demonstration school project to build schools.2011, was identified as the Guangdong Vocational College of 3:2 self-enrollment pilot schools.2012 was awarded the National School Water Science and Technology Invention Competition project pilot schools MEP.
2023-07-29 12:13:541

调试部门用英语怎么说

Debugging department
2023-07-29 12:14:155

冷却塔翻译

2.0的总体要求 本文档定义2.1中的工艺条件,建立了所需的最小的技术要求,详细设计、供应、安装、测试、安装调试冷却塔及相关辅助设备。 22本规格书并不打算涵盖所有细节的冷却塔及助剂,但它是承包商/供应商的责任,看到这样的细节是按照最先进的技术和密码。 23所有的文档中所提及的或附在本说明书应当被认为是相同的。 24承包商/供应商需报的价格从知名的制造商或设备的授权经销商拥有良好的质量控制计划,并拥有丰富经验的生产和供应冷却塔及成员的C.T.I(冷却塔学院)。 所有的组件/助剂2.5%的冷却塔是新的,提供免费从生锈、划痕和其他方面的缺陷。 购买者/ PPW 2.6有权更改或改进规格(如果需要)。 27承包商/供应商应提供必要备件推荐的五年来设备运行情况和价格分手。 承包商/供应商要2.8提供以下信息随着提供: 一)制造商和原产地为每一个组件的包装。 被保证人担保(b)的时期,备件和售后服务都必须被指定的投标。 c)全部的文件给综合细节、工程安装图纸。 所有的框架,盆地2.9%,水池和海水贮罐应由钢筋混凝土(R.C.C)和部分的包装。所有的混凝土结构中接触海水应该内衬合适的材料(如。PE、玻璃钢(GRP等等)。 2.10承包商/供应商的包装应提供所有管道配件及必要的仪表和控制,如风机振动开关、电机断开电气故障,防护的任何必要的连锁装置、逻辑、相对湿度和温度指标为冷却塔进口、出口及周边地区的乾燥、湿塔来衡量灯泡温度等。 主要部件2.11防腐材料应与低噪声水平。 供应商可以引用21.2承包商的其它材料和部件的制造计划,根据然而它应该比上述规格。 供应商应提供2.13承包商的楼梯,人行道和可移动部件都暴露在守卫和配件及人员的安全运行。 供应商应在承包商2.14使用自己的工具和设备的安装,安装所需的塔和其他设备。承包商/供应商,提供特殊工具应列出所需要的正常运行、维修、检测及其他相关设备的塔楼计入包裹
2023-07-29 12:14:331

帮忙英语翻译 急!!

Mercilessearthquake,theworldislove,inordertohelpthepeopletideoverthedifficultiesYushuinQinghaiandrebuildtheirbeautifulhomes,yourschoolstudentsApril20meetingroomsintheschoollaunchedtohelpYushu,Socialcontributionsactivities,contribute1millionaday.朗读显示对应的拉丁字符的拼音字典-查看字典详细内容
2023-07-29 12:15:177

付款条件的翻译(就三句)

交纳合同总价10%的无条件银行担保作为合同履约银行担保(cpbg)。多年不接触商务英语了,意思如此,至于是不是恰当的术语,就不敢保证了。
2023-07-29 12:15:352

车站英语

车站英语是station。1、音标车站的读音["steu026au0283n]。2、短语搭配arrive at a station到达车站。build a station修建车站。depart from a station离开车站。enter a station进入车站。extend a station扩大车站。Union Station 联合车站。Shiroishi Station 白石车站。3、词义解释N:车站,站,台,局,所,署,岗位,(飞机的)编队位置,电视台,广播电台,电视频道,电台频率,驻地,基地,驻地人员,身份,地位,职位,静止状态,大牧场,军港,航空站,机场。V:派驻,驻扎,部署,安排,安置,停泊,站立在某处,配备,配置。3、词性变换过去式:stationed。过去分词:stationed。现在分词:stationing。第三人称单数:stations。Station的例句1、Analysis on Time Data of Fixed Equipment Occupation during Station Technical Operation.车站技术作业占用固定设备时间数据的分析。2、Analysis on Application of Intelligent Simulated Board in Station Commissioning.浅析智能模拟盘在车站开通过程中的应用。3、Approach to Building Design of Stairs and Exit and Entrance in Subway Station.地铁车站楼梯及出入口建筑设计探讨。
2023-07-29 12:15:421

调测英文怎么写

debugging and test
2023-07-29 12:16:403

英文好的帮帮忙吧,翻译一下办公室标牌,要国际通用的!

general managervice managerdepartment of manufaturede technologyroom of supplymeeting roomleisure roomfinancial roomreserch&development roomdesign roomadjustment roomadjustment unitmultifunctional lobbywashroommens locker roomwomens locker room
2023-07-29 12:16:494

R&A,T&C分别是哪两个单词的缩写?

88
2023-07-29 12:17:033

钢管收口机用英语怎么说

你好钢管收口机Tube sealing machine
2023-07-29 12:17:132

履约保函中英文对照

中文文本:   (一)国际工程履约保函格式(公司)   日期:   致:   亲爱的先生:   ________号合同履约保函   题目:   鉴于________公司(以下简称NPOG)就油田地面设施施工、试运和移交与________(以下简称承包商)于________年________月________日签订了________号合同(以下简称合同),我们________,是遵照________法律组建的一家公司,总部设在________,(以下简称担保人),在此想NPOG提供以下担保:   (a) 保证承包商全面完整地履行和完成合同项下的义务以及由更改通知单和合同修改可能引起的需要承包商适时完成的工作。   (b) 如果承包商在某方面未能履行合同项下义务过违约,我们作为担保人将执行或采取必要的措施来按照合同的规定履行义务,由于承包生闻能履行合同或违约所造成的损失、赔偿、花费和费用将由我们担保人承担。   (c) 担保人不会因NPOG放弃或节制对支付、工期、履约或其他方面的要求而解除自己承担的责任。   (d) 一旦担保人承担合同项下承包商的义务,在此期间,担保人应享受合同授予承包商的所有权利和利益。   (e) 为了履行保函和合同的目的,担保人同意接受英国法庭的管辖。   (f) NPOG及其继承人、受让人的利益,对担保人及其继承人、受让人具有约束力。   (g) 该保函从________年________月________日起生效。   有鉴于此,担保人受权其代表于________年________月________日对本保函签字。   ________公司   签字:________   姓名:________   职务:________   日期:________   见证人   签字:________   姓名:________   职务:________   日期:________   英文文本:   PERFORMANCE GUARANTEE FORMAT   Date :   To :   Dear Sirs,   PERFORMANCE GUARANTEE FOR CONTRACT NO:   TITLE:   ________(Company Name)   That in consideration of (hereinafter referred to as "NPOG") entering into a contract for the Construction, Commissioning and Handover of Field Surface Facilities.("CONTRACT") dated________ day-of________ ________with________ hereinafter referred to as "CONTRACTOR (S)""We, ________a company incorporated under the laws of ________with a principal business address at________(hereinafter referred to as " GUARANTOR") do hereby enter into the following undertakings with NPOG:   (a) Guarantee full and complete performance of all obligations of CONTRACTOR(s) under the said CONTRACT and all change orders thereunder and amendments thereof which may subsepuently be duly executed by CONTRACTOR(s).   (b) Should CONTRACTOR in any respect fail to perform the said obligations contained in the said CONTRACT or commits any breach thereof, we as GUARANTOR shall ourselves perform or take whatever steps as may be necessary to achieve performance of the obligations thereof, in accordance with terms of the said CONTRACT and the GUARANTOR shall assume any loss, damages, costs and expenses arising from the said failure or breach for which CONTRACTOR(s) may be made available thereunder;   MUGLAD BASIN OIL DEVELOPMENT PROJEDT   ELELD SURFACE FACILITIES (FSF)   CONTRACT NO:NPOG/30/98-163   (c) we the GUARANTOR shall not be discharged or released from our undertakings hereunder by any waiver or forebearance by NPOG whether as to payment, time , performance, or otherwise.   (d) In the event and for the duration that the GUARANTOR assumes the obligatinos of CONTRACTOR under the said CONTRACT above, the GUARANTOR shall be entitled to all of the rights and benefits to which CONTRACTOR is entitled under CONTRACT.   (e) For the purpose of this Guarantee and the said CONTRACT, the CONTRACTOR does hereby agree to submit to the exclusive jurisdiction of the British Courts.   (f) This Guarantee shall inure to the benefit of NPOG and its successors and assigns, and shall be binding upon the GUARANTOR and its successors and assigns.   (g) This guarantee shall be effective as of the________ day of ____________199_____.   IN WITNESS WHEREOF, THE GUARANTOR has caused this Guarantee to be duly executed by its authorized representative on this ____________day of ____________199____________.   For and on behalf:   ____________   (Company)   signature : ____________   name :   designation :   WITNESS   Signature: ____________   Name: ____________   Designation: ____________   Date: ____________   (二)国际工程履约保函格式(银行)   致:________   ________公司,该公司执行________国家法律,注册办公地址为________(以下简称"NPOG")。   鉴于:   (1) 甲方(NPOG)和乙方(承包商)就________达成协议,并签订本"合同",承包商同意完成合同规定的内容。   (2) 合同明确规定了此条款,即由________银行(以下简称"担保人")及时递交给NPOG该保函。________银行不可撤消和无条件地向NPOG担保以下内容:   1. 如果承包商在任一方面不能履行合同或违约,则根据NPOG第一次提出的不带证据和条件的要求,担保人在收到其要求后14天内,不论承包商或任何第三方是否有异议或反对,担保人都应立即师父总额为________美元的担保金。   2. 在征得或未征得担保人同意的条件下,无论承包商和NPOG间签订何种协议,或者无论承包商在合同项下的义务发生何种变化,或者无论NPOG对于付款时间、履行情况以及其他事项作出何种让步,或无论NPOG或承包商的名字组织机构发生何种改变,都不能免除担保人的担保重任。   3. 本保函持续有效,有效力将相应地保持到最终验收通知单签发日期,或合同终止后3个 ,二者以先为准。   4. 担保人同意,无论未偿还金额能否通过法律行为或仲裁方式获得,并且无论这笔偿还金额是否由于承包商亏损、损坏、花费以及由于NPOG的某些原因造成的,担保人同样给予担保。   本保函由担保人于________年________月________日签订。   ________银行   签字:________   名字:________   职务:________   银行印章:   英文文本:   FERFORMANCE GUARANTEE FORMAT (BANK LETTERHAD)   TO: ____________(Company name),a company incorporated under the laws of and having its registered office at ____________(hereinafter called" NPOG")   WHEREAS   (1) by an agreement for the ____________(hereinafter referred to as the of the one part and NPOG of the other part, the CONTRACTOR agrees to perform the WORKS in accordance with the CONTRACT.   (2) one of the expressed conditions of the CONTRACT is the receipt by NPOG of this guarantee duly executed by (name of banker:) ____________(hereinafter called the " GUARANTOR") who hereby irrevocably and unconditionally guarantees and undertakes to NPOG as follows:   i) if the CONTRACTOR shall in any respect fail to execute the CONTRACT or commit any breach of this obligations thereunder the GUARANTOR shall pay to NPOG on first demand without proof or conditions the sum of US. Dollar ____________(USD: ____________) within 14 days after receipt of the said demand notwithstanding any contestation or protest by the CONTRACTOR or any other third party.   ii) The GUARANTOR shall not be discharged or released from this Guarantee by any agreement made between the CONTRACTOR and NPOG with or without the consent of the GUARANTOR or by any alteration in the obligations undertaken by the CONTRACTOR or by any forbearance whether as to payment time, performances or otherwise, or by any change in mane or constitution of NPOG or the CONTRACTOR.   iii) This guarantee is continuing security and accordingly shall remain in force until the issuance of the notice for final acceptance of three(3) months after the early termination of the CONTRACT, whichever is earlier.   iv) The GUARANTOR agree that the grauantee is given regardless whether or not the sum outstanding occasioned by the loss, damages costs ,expenses or otherwise incurred by NPOG is recoverable by legal action or arbitration.   IN WITNESS whereof this guarantee has been duly executed by GUARANTOR the____________ day of ____________199 ____________.   For and on behalf of ____________   (name of banker)   signature: ____________   name: ____________   designation:   banker" s seal: ____________
2023-07-29 12:17:321

请帮忙翻译一下,急用,谢谢!

我司是一家专业的缩宫机械厂为孟加拉market.现为我们的一个潜在客户的需求我们热衷于10个单位一万吨粮食筒仓容量各钢。说水稻、小麦等。供应商将负责正确的设计、布局、制造和供应成本加运费价的基础。吉大港我们的工程师将负责其安装、调试清洁费高达移交给客户。所以你也将负责提供培训和必要的反馈到我们的工程师进行安装。
2023-07-29 12:17:414

求翻译信用证上要求的单证内容

正本已签的商业发票一式六份:证明货物是中国原产,信用证号,还有进口许可证号,海关编码必须体现在发票上。三正三副全套的已装船清洁可转让海运提单,显示运费预付,付款人为 xxx银行,通知申请人和我们。一正一副受益人证明:提供产品是严格按照信用证中相关的形式发票的规定,并严格遵守条款规定。一正一副原产地证明:由有关政府机构/批准机关/出口国授权的单位出具,证明货物是中国原产必须伴随装运单据一正一副包装证明:包装根据出口标准以及受益人出具的证明必须伴随装运单据。一正一副保证书:从委托之日起12个月或者从交货日期起18个月。受益人证明和快递收据大意是一套不可议付单据在装运后7天内已经通过快递直接寄送给申请人。详细的装箱单一式六份,显示净重和毛重与完整详细的包装。
2023-07-29 12:17:531

求翻译!!急急!!翻译成英文!!谢谢各位大侠了~~

According to a power companies and technical personnel in india company Zhuyuanjin apex of the feedback, apex the company has no force in accordance with a company provided equipment based on the basis of construction equipment, such as : host head, the main 电机部, slalom, the tank and other parts are not in accordance with a force in the identification equipment based on the plane. the excavation the apex or more parts to find a company based only m20 expansion bolt in connection with the ground without a firm foundation in forceThe construction and equipment in the simplest base will lead to the apex. i hope the damage caused to work!!! for the above, we can"t carry out the equipment and technical personnel to install the debugging, the force of the company decided to install the equipment and power company recalled the apex of the length of the technical personnel. to the apex of equipment based entirely consistent with a company to force, force of the company will send someone to the apex of the company for the installation of equipment debugging.
2023-07-29 12:18:014

帮忙翻译个求职信和部分句子(好的追加50分)

I in university period studies specialized is the environment project, After the graduation, works more than 6 year time in ****** Corporation, what is mainly engaged in is Chinese waste gas processing system project and so on northern area electrolytic aluminium, thermoelectricity generation, ferroalloy smelting market developments and the post-sale service. Through communicates with the local Environmental protection department, contracts the air pollution control engineering the design, the manufacture, the installment and the debugging project. I to domestic professions and so on metallurgy, mine, thermoelectricity generation have the understanding, and through the negotiations, has signed many big specified amount contracts, has the strong negotiations ability. Can definitely adapt the business trip. can very skilled use computer MS the OFFICE series office software and uses the AutoCAD series charting software. I am a diligent easy to learn person, the disposition open and bright optimistic, communication ability strong, can endure hardship, work has the sense of responsibility, to have the affinity, can complete the work independently, also has certain organization and the coordinated ability. I believed: The dedication to work and the sense of responsibility enable me to face any difficulty and the challenge! ===========================================in July, 2006: With ***** group negotiations sign waste gas purification system project contract; 2006 year in May: Negotiates with ***** Corporation signs SiO2 to separate the depuration equipment cooperation contract; 2005 year in February - - May, 2006: ****** group ferrosilicon smelting waste gas purification system construction management; ============================================== vocational skill: can use the Office series office software skilled; can use the AutoCAD mechanical drawing software skilled; familiarity computer and network maintenance =========================================== Training experience: in ISO9001:2000 quality control system authentication training, and obtains the examining qualifications
2023-07-29 12:18:232

翻译一句话,语法简单,lacs不会翻译

大气科学实验室<美>
2023-07-29 12:18:314

怎么翻译啊?

收入税为现场服务和海关保证金供应商的技术人员中法律规定对供应商征收通过在由供应商带来了设备调试应当由供应商支付的特殊工具中国海关。
2023-07-29 12:18:424

帮忙把这几句话翻译成英语,不要电脑翻的,多谢了。

基于电梯的结构原理和课题的任务说明,首先分析设计出基于交流双速电机电梯系统的拖动系统电路,拖动系统电路需要能够满足电机实现正反转、快慢速运行、多级调速起动停止功能,并有过载保护、限位保护和相序保护等。 Based on the principle of construction and subject the elevator the mission statement, first analysis is designed based on exchange double speed motor drive system circuit of the system, drag system need to be able to meet the circuit motor to realize positive &negative, slow speed operation, multistage speed stop function, and starting a overload protection, limit protection and sequence protection, etc. 根据集选电梯需要实现的功能确定PLC控制程序的流程、PLC输入输出点数的分配和PLC相关的外围电路,确定所需相关元器件的选型。 According to set selection elevator need to realize the function of PLC control program to determine the flow of the points of input and output, the PLC distribution and PLC related peripheral circuit, determine the related components selection. 再根据集选电梯的控制要求,完成PLC梯形图的设计,并通过仿真软件对程序进行了反复调试和修改,最终完成了整个系统的设计。 Again according to the control requirements of set selection elevator, complete ladder diagram design, PLC and through the simulation software programs and commissioning and modify the, and finally finished the design of the system. 其实我觉得电脑上这个翻译得还可以...
2023-07-29 12:18:583

"试运行阶段"用英语怎么说?

别听他们胡说,工厂试车、试运行是commissioning
2023-07-29 12:19:214

帮忙翻译成英文,不要机器翻译的 谢谢

Security department cooperate with hotel engineering department and construction units in fire fighting facilities improvement, testing and acceptance. So far, the hotel B3, B1, 1F- 3F, 5F, 7F - 22F areas are put into normal use, but the deficiency in current is that the fire equipments in 4F, 6F are still in debugging, fire fighting facilities are waiting for acceptance.
2023-07-29 12:19:382

能否帮忙翻译成英文,太谢谢了!

翻译:I from March 2004 up into the workplace, mainly engaged in are r&d or technical support class work. Did the Windows development, mobile phone PC application or MMI development, done platform has MTK, Cs, etc, also can skillfully use C/C + + / Windows programming/VC. Support customer is responsible earnestly, work overtime hard-working, rich work experience, ability to work well, the colleague customer is reputation. Requirements: 1, familiar with coolsand platform software, understand each segment of code of function and purpose. 2, skilled with SVN version control tool, can correctly use Merge. Correctly give customer Release software, can skilled for customers upgrading software. 3, mastering various commissioning means: Trace, GDB, weathering steel during the use of Coolwatcher, familiar with 4, can handle most compilation, familiar with MAKEFILE and software environment variable Settings (Cgywin environment, env) 5, independently software integration work. Configuration Target, configuration keyboard, modify driver files, code compression, replacement or update part 6, ability to generate code etc T card upgrades, Flash RAMRUN, modify download Calib relevant documents 7, for site cannot solve problems, be able to gather enough information (Trace, GDB, Bug description, reiteration condition, etc.) feedback to r&d, can accelerate the solution of the problem. 8, PC some tools development, for relevant operators use, make itself design and programming. Based on the design, MMI CDMA2000 VIA mobile platform do functional development and expansion, including V200, 2905 type of cell phones, etc. Need to use Windows programming.
2023-07-29 12:19:475

急求翻译几句外贸合同的中的支付条款 30分

against 在这里可理解成“凭...支付”的“凭”字译文:(a) 合同价的10%作为预付款凭担保金额为合同价10%的银行保函支付。(c) (合同价的)70%凭清洁的已装船提单通过信用证支付。信用证付款应按已同意的时间表开立单据,并以独立第三方检验机构出具的已验证接受的检验合格报告为支付条件。(d) (合同价的)10%在设备投料试车并且性能试验完成情况令人满意后根据合同第17款约定凭银行开立的担保金额为合同价的10%的保质期为18个月的银行保函支付。说明:是设备进口合同的条款。这里的有些约定有点儿含糊,比如“satisfactory completion”的含义就没有界定(除非如果在合同中其它条款中约定了),否则在付款或索赔时会有争执。另外,在合同附件中应有银行保函格式(specimen of bank guarantee),包括预付款保函以及尾款保函。
2023-07-29 12:20:043

请帮忙翻译以下内容

My favourite subject is computer.
2023-07-29 12:20:1515

市场部说的T&C什么意思

工程项目里常见有 T&C, 即是 Test and Commissioning, 即测试和调试. 一般涉及信号处理, 大如铁路信号系统, 小如停车场出入口管理, 客人验收前要有 T&C.
2023-07-29 12:20:461